COVID-19 Provisional Sum Sample Clauses

COVID-19 Provisional Sum. The Aggregate Provisional Sum contains a Provisional Sum of [***] US Dollars (US$[***]) for the countermeasures, means, and methods of performing the Work to mitigate COVID-19 listed below, which may be employed by Contractor through Final Acceptance of the Work (“COVID-19 Provisional Sum”). A table identifying the COVID-19 Provisional Sums is below:
COVID-19 Provisional Sum. Set forth in Attachment II are countermeasures, means, methods, responsive and preventative measures with respect to COVID-19 (“COVID-19 Countermeasures”) that Contractor or its Subcontractors or Sub- subcontractors may implement in the performance of the Work in accordance with Section
COVID-19 Provisional Sum. Set forth in Attachment KK are countermeasures, means, methods, responsive and preventative measures with respect to COVID-19 (“COVID-19 Countermeasures”) that Contractor or its Subcontractors or Sub-subcontractors may implement in the performance of the Work in accordance with Section 6.13A.1 and 6.13A.

Related to COVID-19 Provisional Sum

  • Extended Tours/Hybrid Schedules The Employer and the Union may agree to implement extended tours or hybrid schedule (mix of extended and normal tours). For clarity, a hybrid schedule may include extended tours on weekends and normal tours during the week. The following will apply: (a) Each facility/unit must have sixty-six and two thirds percent (66⅔%) agreement of the full-time and part-time employees who work in the facility/ unit. Each Home must have the majority agreement of the full-time and part- time employees who vote on the issue to agree on a trial period of up to six months. Once the trial period is complete, each Home must have a minimum of 66⅔% agreement of the full-time and part-time employees who vote on the issue to continue with the new schedule on a permanent basis. (b) The Extended Tour/Hybrid Schedule may be cancelled by either party on giving ten (10) calendar weeks’ notice to the other in writing of its desire to terminate. A meeting shall be held within two (2) weeks of receipt of such notice to discuss the reasons for the cancellation. Extended tours may be discontinued by the Union in any facility/unit when sixty percent (60%) of the full-time and part-time employees in the facility/unit so indicate by secret ballot to the Union. (c) With the exception of the specific variations set forth in this Article, all other conditions and terms of the Collective Agreement and Appendices shall remain in full force and effect.

  • Flexible Work Schedules An employee may request a modification of their current work schedule to another schedule. The Employer, or its designees, may approve or deny flexible work schedules and retain the responsibility for determining exemptions from, or terminations of, flexible work schedules which adversely affect the operation of the Minnesota Judicial Branch or the level of service to the public.

  • Specific Provisions for Access Rights to Software For the avoidance of doubt, the general provisions for Access Rights provided for in this Section 9 are applicable also to Software. Parties’ Access Rights to Software do not include any right to receive source code or object code ported to a certain hardware platform or any right to receive respective Software documentation in any particular form or detail, but only as available from the Party granting the Access Rights.

  • Schematic Design Phase 1.2.1 Based on the mutually agreed upon Program of Requirements, Amount Available for the Construction Contract and the Project Schedule, the Architect/Engineer shall prepare sufficient alternative approaches utilizing BIM for design and construction of the Project to satisfy Owner’s project requirements and shall, at completion of this phase, submit Schematic Design Documents derived from the model in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review alternative approaches to design and construction for the Project as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by the Owner within the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Schematic Design. The Architect/Engineer shall provide the Construction Manager with a compact disc containing documents and data files derived from the model to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.2.2 Architect/Engineer shall provide all services necessary to perform the services of this phase (preparation of model(s), relevant data, decision support model views and Schematic Design Documents) including, without limitation, unless otherwise approved by Owner, the preparation and prompt delivery of all items specified in the BIM Execution Plan and “Facility Design Guidelines”. 1.2.3 Architect/Engineer shall work closely with Owner in preparation of schematic drawings and shall specifically conform to Owner’s requirements regarding aesthetic design issues. 1.2.4 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.2.5 Before proceeding into the Design Development Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Schematic Design documents and approval of the Architect/Engineer’s preliminary Estimated Construction Cost and schedule. 1.2.6 The Architect/Engineer shall participate in a final review of the Schematic Design Documents and model(s) with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Schematic Design Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments, any of which may be appealed for good cause.

  • Modified Work/Return to Work Programs The Employer and the Union recognize the purpose of modified work/return to work programs, is to provide fair and consistent practices for accommodating nurses who have been ill, injured or permanently disabled, to enable their safe return to work. The parties undertake to provide safe and meaningful employment for all nurses based on the following objectives and principles: