Damaged Chromebooks Clause Samples

Damaged Chromebooks. Like textbooks and other district property issued to your student, there is a responsibility to take care of these valuable resources. Below are details for damages:
Damaged Chromebooks. Students and their parents will be responsible for all damage to the Chromebooks including, but not limited to cracked plastic pieces, damaged ports, frayed cables, inoperability of any kind, etc. Damage to a student’s Chromebook should be reported to the Technology Office at each building campus. Cost of provided repairs to the Chromebook will be the responsibility of the student/parent.
Damaged Chromebooks. Students with malfunctioning Chromebooks may take them to their teacher and ask to borrow a Chromebook while theirs is being repaired or replaced.
Damaged Chromebooks. Like textbooks and other district property issued to your student, there is a responsibility to take care of these valuable resources. Below are details for damages: If a Chromebook can be repaired, we will perform the first repair for free. Any additional repairs will be $50. We can repair screens, keyboards, and batteries. We will replace the first charger for free whether it is damaged or lost. Additional chargers will be $30. We will make every effort to repair a Chromebook. We want these devices working as much as you do. Intentional damage such as drawing on the Chromebook, stickers, picking keys off the keyboard, rearranging keys on the keyboard, etc. will be the responsibility of the student to pay to replace/repair the damage at full cost with a minimum fee of $5 charged.

Related to Damaged Chromebooks

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 4.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work. 4.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4.12.4 The Contractor shall review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the State or any separate contractor, all Shop Drawings, Product Data and Samples required by the Contract Documents. 4.12.5 By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he / she has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he / she has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 4.12.6 The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data or Samples under Subparagraph 2.2.7 of these General Conditions unless the Contractor has specifically informed the Architect and the State in writing of such deviation at the time of sub- mission and the Architect and the State has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Architect's approval thereof. 4.12.7 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Architect on previous submittals. 4.12.8 No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Architect as provided in Subparagraph 2.2.7 of these General Conditions. All such portions of the Work shall be in accordance with approved submittals.

  • Product Data Illustrations, standard schedules, performance charts, instructions, brochures, diagrams, and other information furnished by Developer to illustrate a material, product, or system for some portion of the Work.

  • Samples The Contractor shall submit the following samples of Materials and relevant information to the Authority’s Engineer for pre-construction review: (a) manufacturer's test reports and standard samples of manufactured Materials; and (b) samples of such other Materials as the Authority’s Engineer may require.