PURPOSE AND IMPLEMENTATION This Umbrella Agreement (hereinafter referred to as the "Agreement" or "Umbrella Agreement") shall be for the purpose of collaborative research, development, and testing opportunities on various topics of mutual interest to enable advanced understanding of aeronautics, science, and space systems research and development and to provide workforce development in Science, Technology, Engineering, and Mathematics (STEM) while furthering NASA’s research and development goals. The Parties shall execute one (1) Annex Agreement (hereinafter referred to as the "Annex") concurrently with this Umbrella Agreement. The Parties may execute subsequent Annexes under this Umbrella Agreement consistent with the purpose and terms of this Umbrella Agreement. This Umbrella Agreement shall govern all Annexes executed hereunder; no Annex shall amend this Umbrella Agreement. Each Annex will detail the specific purpose of the proposed activity, responsibilities, schedule and milestones, and any personnel, property, or facilities to be utilized under the task. This Umbrella Agreement takes precedence over any Annexes. In the event of a conflict between the Umbrella Agreement and any Annex concerning the meaning of its provisions, and the rights, obligations and remedies of the Parties, the Umbrella Agreement is controlling.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Implementation Plan The Authority shall cause to be prepared an Implementation Plan meeting the requirements of Public Utilities Code Section 366.2 and any applicable Public Utilities Commission regulations as soon after the Effective Date as reasonably practicable. The Implementation Plan shall not be filed with the Public Utilities Commission until it is approved by the Board in the manner provided by Section 4.9.
First Source Hiring Program Contractor must comply with all of the provisions of the First Source Hiring Program, Chapter 83 of the San Francisco Administrative Code, that apply to this Agreement, and Contractor is subject to the enforcement and penalty provisions in Chapter 83.
Safety Plan Developer’s safety plan specifically adapted for the Project. Developer's Safety Plan shall comply with all provisions regarding Project safety, including all applicable provisions in these Construction Provisions.