Common use of Delivery / Collection Clause in Contracts

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 31 contracts

Sources: Contract for the Provision of Maintenance and Support, Contract for Psychological, Psychiatric and Therapeutic Services, Provision of GPS Tracking System

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b27.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c27.c.

Appears in 21 contracts

Sources: Contract, Manufacture, Supply and Delivery Agreement, Contract

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 19 contracts

Sources: Viking Combined Support Contract, Provision of a Flight Tasking Management System, Provision of a Mission Aircrew Isr Operator Training

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s 's Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s 's Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s 's Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 4 contracts

Sources: Contract, Intelligent Ship Phase 3 Contract, Contract

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance Delivery Note. One delivery note per order/delivery is required. In addition, to assist with the instructions;processing of the receipt and subsequent payment, the delivery note shall be clearly marked with the following information in a human readable Barcode 39 font: Contract Number Order Number NSN PR Number (where applicable) Quantity The delivery note shall make no reference to Terms and Conditions other than those stated in the contract. (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)); a Delivery Note. One delivery note per order/delivery is required. In addition, a DEFFORM 129J in accordance to assist with the instructions;processing of the receipt and subsequent payment, the delivery note shall be clearly marked with the following information in a human readable Barcode 39 font: Contract Number Order Number NSN PR Number (where applicable) Quantity The delivery note shall make no reference to Terms and Conditions other than those stated in the contract (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 4 contracts

Sources: Supply Agreement, Supply Agreement, Supply Agreement

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s 's Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s 's Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s 's Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 4 contracts

Sources: Purchase Agreement, Purchase Agreement, Contract for the Provision of Design and Integration Partner

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Deliverydelivery; and (54) Deliver deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (54) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 3 contracts

Sources: Contract for Repair and Refurbishment Services, Terms and Conditions, Supply Agreement

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 2 contracts

Sources: Contract for the Provision of Training Vouchers, Supply Agreement

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructionsinstructions shown therein and in the explanatory notes, the appropriate coloured copy of MOD Form 640, or a Delivery note; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 2, (Schedule of RequirementsRequirements for Associated Goods) by the Delivery Date between the hours agreed by the Parties.; c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party Party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructionsinstructions shown therein and in the explanatory notes, the appropriate coloured copy of MOD Form 640, or a Delivery note; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.bb; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.c.

Appears in 2 contracts

Sources: Aesp & Technical Documentation Support Contract, Contractor Logistic Support Agreement

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule Sch edule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b27.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c27.c.

Appears in 2 contracts

Sources: Contract, Contract

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b26.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c26.c.

Appears in 1 contract

Sources: Supply Agreement

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 1 contract

Sources: Initial in Service Support Solution Contract

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance Delivery Note. One delivery note per order/delivery is required. In addition, to assist with the instructions;processing of the receipt and subsequent payment, the delivery note shall be clearly marked with the following information in a human readable Barcode 39 font: Contract Number Order Number NSN PR Number (where applicable) Quantity The delivery note shall make no reference to Terms and Conditions other than those stated in the contract. (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. The Contractor shall (or procure that any of its subcontractors shall) comply with the requirements set out in the Logistics Commodities Services Transformation Authority Managed Material supplier Manual (Version 2 – LDOC/CMO/V2.0 dated 28 June 2019) issued by the Authority and published on the Authority’s Knowledge in Defence (KiD) system (as amended from time to time) (the “LCST Supplier Manual”) in respect of all goods which are: (1) Supplied by the Contractor or any of its subcontractors under this Contract and (2) Which are to be delivered to depots which are managed and/or operated by Leidos Europe Ltd or its subcontractors pursuant to the Logistics Commodities and Services (Transformation) contract (Contract No. [LCST/0001]) (“LCS(T) Managed Depots”) d. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)); a Delivery Note. One delivery note per order/delivery is required. In addition, a DEFFORM 129J in accordance to assist with the instructions;processing of the receipt and subsequent payment, the delivery note shall be clearly marked with the following information in a human readable Barcode 39 font: Contract Number Order Number NSN PR Number (where applicable) Quantity The delivery note shall make no reference to Terms and Conditions other than those stated in the contract (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. e. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 1 contract

Sources: Supply Agreement

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 6 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b27.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c27.c.

Appears in 1 contract

Sources: Contract for Strategic Analysis Support

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested;. (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet);. (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions;. (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested;. (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet);. (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions;. (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b27.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c27.c.

Appears in 1 contract

Sources: Supply and Support Contract

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, by (as specified in Schedule 3 (Contract Data Sheet)), ) a DEFFORM 129J in accordance with the instructions;. (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions;. (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.bb; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.c.

Appears in 1 contract

Sources: Contract for the Provision of Combined Support Services

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, A Delivery Note (as specified in Schedule 3 (Contract -Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions;. (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 2, (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties.; c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party Party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructionsinstructions shown therein and in the explanatory notes, the appropriate coloured copy of MOD Form 650, or a Delivery note; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.bb; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.c.

Appears in 1 contract

Sources: Contract for Repair Services

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions;a (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b27.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c27.c.

Appears in 1 contract

Sources: Contract for the Procurement of Breaching Shotgun

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. All deliveries are to be ExWorks from the Contractors Luton facility unless requested on the tasking authorisation form at Schedule 9. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) i. contact the Authority’s 's Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information information pertinent to Delivery requested; (2) ii. comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) iii. ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) iv. be responsible for all costs of Delivery; and (5) v. Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) i. contact the Authority’s 's Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) ii. comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) iii. ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) iv. ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) v. in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s 's Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) i. on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) ii. on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 1 contract

Sources: Contract for Installation and Integration Services

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b28.a; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c0.

Appears in 1 contract

Sources: Procurement and Support Contract

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s 's Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s 's Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet);Data (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s 's Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 1 contract

Sources: Contract for Simulator Support

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, A Delivery Note (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions;. (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address as stated in Table 2 of Schedule 2 2, (Schedule of RequirementsRequirements for Associated Goods) by the Delivery Date between the hours agreed by the Parties.; c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party Party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data SheetDEFFORM 111) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (Consignor, as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (54) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.bb; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.c.

Appears in 1 contract

Sources: Repair Agreement

Delivery / Collection. a. a) Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. b) Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. c) Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. d) Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b27.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c27.c.

Appears in 1 contract

Sources: Support Contract

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing:the (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 1 contract

Sources: Contract for Audio Visual & Communications Equipment Support & Supply Package

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheetsheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (5) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 1 contract

Sources: Contract for Sales Management System

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Deliverydelivery; and (54) Deliver deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (54) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 1 contract

Sources: Supply Agreement

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, A Delivery Note (as specified in Schedule 3 (Contract -Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions;. (4) be responsible for all costs of Delivery; and (5) Deliver the Contractor Deliverables to the Consignee at the address as stated in Table 2 of Schedule 2 2, (Schedule of RequirementsRequirements for Associated Goods) by the Delivery Date between the hours agreed by the Parties.; c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party Party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data SheetDEFFORM 111) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (Consignor, as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (54) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.bb; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.c.

Appears in 1 contract

Sources: Calibration and Repair Agreement

Delivery / Collection. a. Schedule 3 (Contract Data Sheet) shall specify whether the Contractor Deliverables are to be Delivered to the Consignee by the Contractor or Collected from the Consignor by the Authority. b. Where the Contractor Deliverables are to be Delivered by the Contractor (or a third party acting on behalf of the Contractor), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative as detailed in Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree administrative arrangements for Delivery and provide any Information pertinent to Delivery requested; (2) comply with any special instructions for arranging Delivery in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) be responsible for all costs of Delivery; and (54) Deliver the Contractor Deliverables to the Consignee at the address stated in Schedule 2 (Schedule of Requirements) by the Delivery Date between the hours agreed by the Parties. c. Where the Contractor Deliverables are to be Collected by the Authority (or a third party acting on behalf of the Authority), the Contractor shall, unless otherwise stated in writing: (1) contact the Authority’s Representative (Transport) as detailed in box 10 of DEFFORM 111 at Annex A to Schedule 3 (Contract Data Sheet) in advance of the Delivery Date in order to agree specific arrangements for Collection and provide any Information pertinent to the Collection requested; (2) comply with any special instructions for arranging Collection in Schedule 3 (Contract Data Sheet); (3) ensure that each consignment of the Contractor Deliverables is accompanied by, (as specified in Schedule 3 (Contract Data Sheet)), a DEFFORM 129J in accordance with the instructions; (4) ensure that the Contractor Deliverables are available for Collection by the Authority from the Consignor (as specified in Schedule 3 (Contract Data Sheet)) by the Delivery Date between the hours agreed by the Parties; and (54) in the case of Overseas consignments, ensure that the Contractor Deliverables are accompanied by the necessary transit documentation. All Customs clearance shall be the responsibility of the Authority’s Representative (Transport). d. Title and risk in the Contractor Deliverables shall only pass from the Contractor to the Authority: (1) on the Delivery of the Contractor Deliverables by the Contractor to the Consignee in accordance with clause 28.b; or (2) on the Collection of the Contractor Deliverables from the Consignor by the Authority once they have been made available for Collection by the Contractor in accordance with clause 28.c.

Appears in 1 contract

Sources: Supply Agreement