Demolition Requirements Sample Clauses

Demolition Requirements. (a) Without limiting Project Co’s obligation to perform the Works at all times in accordance with Applicable Law, in respect of any Demolition, Project Co shall, and shall cause each applicable Project Co Party that is performing any part of the Demolition to, at such person’s own cost and risk and at all times during the performance of the Works: (i) conduct all work in connection with any Demolition at all times in compliance with section 3 of the Performance Standards Regulation and the Building Code; (ii) ensure that all Project Co Parties having responsibility for the supervision of any such Demolition are qualified as either a professional engineer, limited license holder or provisional license holder (as such terms are used in the Performance Standards Regulation) (such person is hereinafter referred to as a “Demolition Supervisor”); (iii) observe and perform the Demolition in a manner that is consistent with the recommendations set forth in the Demolition Guidelines in all material respects; and (iv) in respect of any Complex Structure Demolition to be conducted by Project Co or any applicable Project Co Party: (A) prepare detailed specifications relating to such Complex Structure Demolition which specifications will include a detailed risk assessment and risk mitigation plan assessing all apparent or inferable risks that might be associated with the Demolition, colour-coded Load-Path Diagrams (which will include a description of the Demolition Requirements set forth herein) to supplement the Site work plans and blueprints relating to the Demolition and all other technical requirements relating to the Complex Structure Demolition (the “Demolition Specifications”); (B) at all times when a Complex Structure Demolition is being performed that the Demolition Specifications, Demolition work plans and Load-Path Diagram, be present and available at the Site at which such Complex Structure Demolition is being performed; and (C) ensure at all times when a Complex Structure Demolition is being performed that a Demolition Supervisor will be on the Site at which such Complex Structure Demolition is being performed and actively supervising all activities in respect of the Complex Structure Demolition, (collectively the “Demolition Requirements”). (b) If at any time while any Demolition is being performed pursuant to this Project Agreement, Project Co or any Project Co Party that is performing any part of any Demolition receives Notice from Contracting Authority...
Demolition Requirements. Until such time as the demolition is undertaken, and unless the structure is currently in use, the existing structure shall be maintained and secured by boarding up all openings, erecting a security fence, and removing all debris, bushes and planting that inhibit the easy surveillance of the property to the satisfaction of the Building and Safety Officer and the Fire Department. Any landscaping material remaining shall be watered and maintained until demolition occurs.
Demolition Requirements. A. Explosives: The use of explosives will not be permitted. B. Protection: Carefully protect all mechanical and electrical equipment against dust and debris. C. Removal: Remove all debris from the structures during demolition and do not allow debris to accumulate in piles. D. Abandoned Pipelines: Fill all abandoned pipelines using grout in accordance with Section 03310.
Demolition Requirements. The property owner and/or the Contractor shall obtain a demolition permit prior to commencing the demolition of any structure in the corporate limits of the City of [____]. Prior to issuance of the Order to proceed with demolition, the Contractor shall ensure that all meters, service loops, lines, cables and instruments shall be disconnected, abandoned and/or removed prior to commencement of any demolition and/or site clearance.If the Contractor finds that any such items have not been disconnected, abandoned and/or removed, the Contractor shall not proceed with the demolition and/or site clearance until such items have been disconnected, abandoned and/or removed. It is the duty of the owner and/or the Contractor to contact all utility companies, and ensure that all utilities have been disconnected abandoned and/or removed prior to commencement of any demolition and/or site clearance. If Contractor finds that any such items have not been disconnected, abandoned and/or removed, Contractor shall not proceed with the demolition and/or site clearance until such items have been disconnected, abandoned and/or removed. It is the duty of the owner and/or Contractor to contact all utility companies, and ensure that all utilities have been disconnected.
Demolition Requirements. (a) Without limiting Project Co’s obligation to perform the Work at all times in accordance with Applicable Law, in respect of any Demolition, Project Co shall, and shall cause each Project Co Party that is performing any part of the Demolition to, at such person’s own cost and risk and at all times during the performance of the Work:

Related to Demolition Requirements

  • Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. (i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. (ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. (iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.

  • Installation requirements As may be further described and set forth in the Scope of services, all installation, integration, and other potentially public works construction activities which may be contemplated by Contractor, shall be performed in accordance with all applicable, laws, rules, and regulations of the District.

  • Submission Requirements Requirement Deliverable (Report Name) Due Date Submission System

  • Application Requirements This application shall contain, as a minimum, a sketch showing the location of proposed facilities; a description, sketch, manufacturer’s brochure, etc. of the proposed facilities; and a description of the operation proposed. (11-28-90) 101. -- 199. (RESERVED)‌ 200. OPERATIONAL AGREEMENT.‌‌

  • GRADUATION REQUIREMENTS I understand that in order to graduate from the program and to receive a certificate of completion, diploma or degree I must successfully complete the required number of scheduled clock hours as specified in the catalog and on the Enrollment Agreement, pass all written and practical examinations with a minimum score of 80%, and complete all required clinical hours and satisfy all financial obligations to the College.