DESIGN CONCEPT AND SCHEMATICS REPORT Sample Clauses

DESIGN CONCEPT AND SCHEMATICS REPORT. Consultant shall prepare and present, in writing and at an oral presentation if requested, for approval by City, a Design Concept and Schematics Report, comprising Schematic Design Studies, including an identification of any special requirements affecting the Project, a Statement of Probable Construction Cost, Project Development Schedule and review of Constructability Review reports. Schematic Design Studies consist of site plan(s), floor plans (where applicable), elevations, sections, and all other elements required by City or Project Manager to show the scale and relationship of the components and design concepts of the whole. The floor plans may be single-line diagrams. A simple perspective rendering or sketch, model or photograph thereof may be provided to further show the design concept. A Statement of Probable Construction Cost, prepared in Construction Standard Index (CSI) format, to include a summary of the estimated Project cost and an evaluation of funding allocation. Such summary shall be in sufficient detail to identify the costs of each element and include a breakdown of the fees, general conditions and construction contingency. Such evaluation shall comprise a brief description of the basis for estimated costs per each element and similar Project unit costs. Costs shall be adjusted to the projected bid date. Recommendations for reducing the scope of the Project in order to bring the estimated costs within allocated funds, in the event that the statement of Probable Construction Costs exceeds allocated funds, Consultant shall update its documentation, at no additional cost to the City, to reflect this reduced scope. Any “Statement of Probable Construction Costs” prepared by Consultant represents a reasonable estimate of cost in Consultant’s best judgment as a professional familiar with the local construction industry. The Project Development Schedule shall show the proposed completion date of each task of the Project through design, bidding, and post design services. Constructability Review reports shall be conducted by the City and/or the Consultant at design stages deemed necessary by the Project Manager. Consultant shall provide five additional deliverable plan sets for distribution, by City, to others for this purpose. There shall be an established deadline for review report submission back to the City. Consultant shall provide written responses to all comments within two weeks and shall maintain files of all related review reports and re...

Related to DESIGN CONCEPT AND SCHEMATICS REPORT

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Construction materials (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) do not apply to Recovery Act designated country manufactured construction material. The restrictions of the Buy American statute do not apply to designated country unmanufactured construction material. Consistent with U.S. obligations under international agreements, this clause implements--

  • Instructional Materials A. The Board recognizes that appropriate texts, library reference facilities, maps and globes, laboratory equipment, audio-visual equipment, art supplies, athletic equipment, current periodicals, standard tests and questionnaires, computers, and similar materials are the tools of the teaching profession. B. Efforts shall be continued to seek and use instructional materials which reflect the contribution and presence of diverse ethnic and cultural groups. C. 1. Selection of instructional materials for each school shall be made by a committee of teachers chosen by the faculty within that school.

  • Course Materials The adoption of any course materials, print or electronic, after a Course Agreement is signed will require an agreed and signed addendum.