Design Development and 100% Construction Drawings Sample Clauses

The 'Design Development and 100% Construction Drawings' clause defines the requirement for the contractor or design professional to prepare and deliver fully developed design documents and complete construction drawings. This typically involves progressing from initial design concepts through detailed plans, specifications, and technical drawings that are ready for use in actual construction. The clause ensures that all necessary information, dimensions, and materials are clearly documented so that the project can be built as intended without ambiguity. Its core function is to guarantee that the construction team has comprehensive, finalized documents, thereby minimizing errors, omissions, and misunderstandings during the building process.
POPULAR SAMPLE Copied 1 times
Design Development and 100% Construction Drawings. The Developer shall submit for approval to Centre City Development Corporation (CCDC) Design Development and 100% Construction Drawings which implement the design intent of the Basic Concept/Schematic Drawings and any requirements included in the Centre City Development Permit No. 2009-07. FORM OF AMENDMENT TO AGREEMENT AFFECTING REAL PROPERTY OFFICIAL BUSINESS Document entitled to free recording per Government Code Section 6103 Recording Requested by and When Recorded Mail to: ▇▇▇ ▇▇▇▇ ▇▇ ▇▇▇ ▇▇▇▇▇ ▇/▇ ▇▇▇▇▇▇ ▇▇▇▇ Development Corporation ▇▇▇ ▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇ ▇▇▇ ▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ Attn: Eri Kameyama THIS AMENDMENT TO AGREEMENT AFFECTING REAL PROPERTY (Including Rental Restrictions) (“Amendment”) is made and entered into as of this day of , 2012, by and between the CITY OF SAN DIEGO, a municipal corporation (“City”), and BROADWAY TOWER ASSOCIATES, L.P., a California limited partnership (“Owner”).
Design Development and 100% Construction Drawings. The Developer shall submit for approval to Civic San Diego Design Development, Construction Drawings pursuant to the Schedule of Performance attached to the DDA as Attachment No. 5. Purchase Price $20,000,000 RFP Proposal Clermont Hotel Purchase $4,000,000 Agreement Pre‐Dev Carry / Closing $200,000 Estimate Total Land Costs $24,200,000 Hard Costs Sitework $5,050,000 ▇▇▇▇▇▇ Estimate Parking $40,095,000 ▇▇▇▇▇▇ Estimate Shell $202,375,000 ▇▇▇▇▇▇ Estimate TIA $9,676,485 Office Space FF&E $13,950,000 Lobbies and Hotel Total Hard Costs $271,146,485 Soft Costs Consultant Costs $19,838,000 Estimate Permits & Fees $9,156,000 Estimate Overhead $11,445,000 Through 2019 Taxes / Ins / Marketing / Oth $26,845,000 Estimate Total Soft Costs $67,284,000 Financing Costs Loan Fee $1,800,000 .5% on 1st and 1% on Mezz Other Costs $2,289,000 Broker, Due Diligence and Legal Interest $22,898,150 4% on 1st and 12% on Mezz Total Financing Costs $26,987,150 Contingency $10,382,366 3% of Hard and Soft Costs (Rounded) TOTAL PROJECT COSTS $400,000,000 This is the Method of Financing attached to the Disposition and Development Agreement (“DDA”) by and between the City of San Diego (the “City”) and Cisterra 7th & Market, LLC, a California limited liability company (“Developer”), pertaining to the development of a multi-family housing project known as Seventh & Market, in the City of San Diego, as more specifically described in the DDA (“Project”). DDA as used herein shall mean, refer to and include the DDA, as well as any riders, exhibits, addenda, implementation agreements, amendments and attachments thereto (which are hereby incorporated herein by this reference) or other documents expressly incorporated by reference in the DDA. Any capitalized term not otherwise defined herein shall have the meaning ascribed to such term in the DDA. It is anticipated that there may be minor changes in the estimated amounts of Acquisition and Development Costs, Sources of Financing, or other figures presently reflected in the Project Budget. The Mayor shall have the authority to make reasonable written modifications to this Method of Financing, provided that any such modification does not adversely affect the receipt of any benefit or right of the City under the DDA or increase any City obligation or liability under the DDA.
Design Development and 100% Construction Drawings. The Developer shall submit for approval to Civic San Diego Design Development, 50% Construction Drawings and 100% Construction Drawings which implement the design intent of the Basic Concept/Schematic Drawings and any requirements included in the Centre City Development Permit No. 2011-59.
Design Development and 100% Construction Drawings. The Developer shall submit for approval to City the Design Development, 50% Construction Drawings and 100% Construction Drawings, which implement the design intent of the Basic Concept/Schematic Drawings.

Related to Design Development and 100% Construction Drawings

  • Selection of Architect/Construction Drawings Tenant shall retain -------------------------------------------- Gensler as the architect/space planner (the "Architect") to prepare the "Construction Drawings", as that term is defined in this Section 3.1. Tenant shall retain Landlord's engineering consultants (the "Engineers") to prepare all plans and engineering working drawings relating to the structural, mechanical, electrical, plumbing, HVAC, lifesafety, and sprinkler work in the Premises, which work is not part of the Base, Shell and Core work. The fees changed by the Engineers shall be comparable to the fees charged by comparable engineers performing comparable work in the Comparable Buildings. The plans and drawings to be prepared by Architect and the Engineers hereunder shall be known collectively as the "Construction Drawings." All Construction Drawings shall comply with Landlord's drawing format and specifications. Landlord's review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord's review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord's space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings, and Tenant's waiver and indemnity set forth in Section 10.1 of this Lease shall specifically apply to the Construction Drawings. Furthermore, Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the Plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Technical Specifications and Drawings a) The Goods and Related Services supplied under this Contract shall conform to the technical specifications and standards mentioned in Section VI, Schedule of Requirements and, when no applicable standard is mentioned, the standard shall be equivalent or superior to the official standards whose application is appropriate to the Goods' country of origin. b) The Supplier shall be entitled to disclaim responsibility for any design, data, drawing, specification or other document, or any modification thereof provided or designed by or on behalf of the Procuring Entity, by giving a notice of such disclaimer to the Procuring Entity. c) Wherever references are made in the Contract to codes and standards in accordance with which it shall be executed, the edition or the revised version of such codes and standards shall be those specified in the Schedule of Requirements. During Contract execution, any changes in any such codes and standards shall be applied only after approval by the Procuring Entity and shall be treated in accordance with GCC Clause 33.

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.