Design to Budget Clause Samples

The "Design to Budget" clause requires that the design of a project be developed and maintained within a specified budget limit. In practice, this means the design team must make material, system, and scope decisions that do not exceed the financial constraints set by the client or project owner. For example, if the budget is capped at a certain amount, the architect must select finishes and structural systems that fit within that cost. This clause ensures that the project remains financially viable and prevents cost overruns by aligning design choices with the available budget from the outset.
POPULAR SAMPLE Copied 18 times
Design to Budget. Architect will design the Project in accordance with Roman Catholic Church Standards and The Built of Living stones Art, Architect and Worship when a Worship space is the Project or part of a Project, within the budget approved by Owner and to be attached hereto as Exhibit D (“Project Budget”) for each phase of the Services. Prior to the completion of each phase of Architect’s Services, the Architect will develop a cost estimate of the Work Owner to ascertain whether the design meets the latest approved Project Budget. All redesign services required to meet the approved budget shall be performed at no cost to Owner.
Design to Budget. 1.1.3.1 The Design Consultant shall plan and design the Project in such a manner that the Agreed Cost of the Work does not exceed the sum of $472,700,000.00 without the express written approval of the Director. The sum of $472,700,000.00 is an unescalated amount as of November 2015 which may be increased or decreased by the Director, in his sole discretion. 1.1.3.2 The Design Consultant shall continuously monitor and participate in updating the Probable Cost of the Work throughout the design process. If at any time during the course of this Project the Probable Cost of the Work, for all Work designed and specified, exceeds or becomes likely to exceed the Agreed Cost of the Work, as updated from time to time, the Design Consultant shall immediately notify the Director. Upon becoming aware that the Probable Cost of the Work will exceed the current Agreed Cost of the Work, the Director, in his sole discretion, may by written notice either: (i) increase the Cost of the Work (ii) reduce the scope, or (iii) require a re-design of the Project by Design Consultant. 1.1.3.3 There shall be no increase in the Design Consultant's compensation for any such re-design to maintain the Agreed Cost of the Work, unless such re-design is a result of cost increases that are not reasonably foreseeable. For purposes of Section 1.1.3, inclusive of all sections therein, no person other than the Director may provide written authorization to change the Agreed Cost of the Work specified herein.
Design to Budget. The process by which the Design Consultant designs the Project to ensure the Agreed Cost of the Work is not exceeded.
Design to Budget. Intentionally deleted.
Design to Budget. The process by which the DB’s Designer designs the Project to ensure the Cost of the Work is not exceeded.
Design to Budget. I-4.a. To the extent the Services provided by the Design Professional will result in the construction of a Project (in whole or in part), the Design Professional shall perform the Services required under this Agreement so as to permit the award of a contract for construction of a Project, or portion(s) of the Projects defined by the Airport Authority, at an amount and all-inclusive total construction cost to the Airport Authority that does not exceed the Estimated Construction Cost established for each Project or the Projects. When probable construction cost reports or bids/proposals for the construction contract(s) are received for a Project that exceed the Estimated Construction Cost, the Design Professional shall perform any and all redesign or modifications and other Services necessary to permit award of a construction contract for an amount and all-inclusive total construction costs that does not exceed the Estimated Construction Cost. The Design Professional’s redesign, modifications and other Services shall be performed at no increase in the Compensation set forth in the AFS(s) and without any payment of any amount or type from the Airport Authority as it is specifically agreed the Design Professional shall bear any and all expenses, costs and liabilities required to redesign and modify the Project(s). If the Airport Authority determines, in its sole and absolute discretion, that unfavorable probable construction cost reports or bids/proposals are the result of conditions beyond the Design Professional’s reasonable control, those factors will be taken into consideration in determining whether the Design Professional may be entitled to any additional Compensation for Services required for a Project or Projects. However, under no circumstances shall there be any increase in any Compensation authorized by this Agreement except by an Amendment duly executed by an authorized representative of the Airport Authority in accordance with applicable law and as provided in paragraph I.3.o. I-4.b. The Design Professional shall immediately advise the Airport Authority if it finds that the Project or Projects being designed will exceed or are likely to exceed the Estimated Construction Cost, and if the Design Professional is unable to design a usable project within these limitations. Upon receipt of such information, the Airport Authority will review the Design Professional’s revised estimate of construction cost. The Airport Authority may, if it determines that t...
Design to Budget. 1.1.3.1 The Design Consultant shall plan and design the Project in such a manner that the Agreed Cost of the Work does not exceed the sum of $ without the express written approval of the Director. The sum of $ is an unescalated amount as of May 2016 which may be increased or decreased by the Director, in his sole discretion. 1.1.3.2 The Design Consultant shall continuously monitor and participate in updating the Probable Cost of the Work throughout the design process. If at any time during the course of this Project the Probable Cost of the Work, for all Work designed and specified, exceeds or becomes likely to exceed the Agreed Cost of the Work, as updated from time to time, the Design Consultant shall immediately notify the Director. Upon becoming aware that the Probable Cost of the Work will exceed the current Agreed Cost of the Work, the Director, in his sole discretion, may by written notice either: (i) increase the Cost of the Work (ii) reduce the scope, or (iii) require a re-design of the Project by Design Consultant. 1.1.3.3 There shall be no increase in the Design Consultant's compensation for any such re-design to maintain the Agreed Cost of the Work, unless such re-design is a result of cost increases that are not reasonably foreseeable. For purposes of Section 1.1.3, inclusive of all sections therein, no person other than the Director may provide written authorization to change the Agreed Cost of the Work specified herein.
Design to Budget. A. The Design Builder shall be responsible for establishing and updating the Project Construction Cost estimate monthly throughout development of the Construction Documents. Many of these estimates may be on specific Design to Budget allocations to ensure that the design is developing and maintaining expected quality standards. B. The initial Design to Budget cost component will be consistent with the HAS WBS and to a level of detail so a scope to budget analysis can be performed. Each WBS will be broken down as defined in the CSI MasterFormat. C. During the design process, the DB shall conduct constructability reviews and provide input and suggestions for design optimization to align the design with the Agreed cost of the Work. The DB will perform more detailed analysis of selected items to include alternative methods, systems, materials, equipment, or designs feasible to complete the construction at the lowest reasonable cost while achieving HAS’s Project objectives. D. During the performance of the final design, any change to the Probable Cost of the Work due to changes or proposed changes in the Design shall be immediately forwarded in a letter to the OMT. The DB shall not proceed with those affected elements of final Design or Construction if the Probable Cost of the Work exceeds the Contract Price. E. The DB will evaluate opportunities and make recommendations to improve maintainability and sustainability and reduce lifecycle costs and energy use.
Design to Budget. I-4.a. To the extent the Services provided by the Construction Professional will result in the construction of a Project (in whole or in part), the Construction Professional shall perform the Services required under this Agreement so as to permit the award of a contract for construction of a Project, or portion(s) of the Projects defined by the Airport Authority, at an amount and all-inclusive total construction cost to the Airport Authority that does not exceed the Estimated Construction Cost established for each Project or the Projects. When probable construction cost reports or bids/proposals for the construction contract(s) are received for a Project that exceed the Estimated Construction Cost, the Construction Professional shall advise the Design Professional of modifications and other Services necessary to yield a award of a construction contract for an amount and all-inclusive total construction costs that does not exceed the Estimated Construction Cost. . within these limitations. Upon receipt of such information, the Airport Authority will review the Construction Professional’s revised estimate of construction cost. The Airport Authority may, if it determines that the established Estimated Construction Cost set forth is so low that award of a construction contract not in excess of such estimate is improbable, authorize a change in scope or materials as required to reduce the estimated cost for construction to an amount within the established Estimated Construction Cost, or the Airport Authority may determine to exceed the established Estimated Construction Cost. The Construction Professional shall proceed following the written direction of the Airport Authority.

Related to Design to Budget

  • Project Budget A Project Budget shall be prepared and maintained by Grantee. The Project Budget shall detail all costs for which the Grant will be used during the Term. The Project Budget must be approved in writing by the Project Monitor. Grantee shall carry out the Project and shall incur costs and make disbursements of funds provided hereunder by the Sponsor only in conformity with the Project Budget. The current approved Project Budget is contained in Attachment “C”. Said Project Budget may be revised from time to time, but no Project Budget or revision thereof shall be effective unless and until the same is approved in writing by Project Monitor. The funds granted under this Grant Contract cannot be used to supplant (replace) other existing funds.

  • Development Budget Attached hereto as Exhibit "B" and incorporated herein by this reference is the Development Budget in an amount equal to $_____________. Owner acknowledges and represents that the attached Development Budget includes the total costs and expenses to acquire, develop, renovate and construct the Real Property and the Apartment Housing.

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”