Detailed Setting Out Sample Clauses

The Detailed Setting Out clause requires that the contractor or responsible party precisely mark and establish the physical locations and dimensions of works on the site before construction begins. This process typically involves using plans, drawings, and survey data to accurately position foundations, structures, or utilities, ensuring that all elements are built in the correct locations. By mandating this careful preparation, the clause helps prevent costly errors, misalignments, and disputes over placement, thereby ensuring the project proceeds according to design specifications.
Detailed Setting Out. Reference pegs shall be 50mm by 50mm in section 600mm long driven 400mm firmly into ground and painted white above the ground. The offset from centre line shall be indicated by small nail 20mm to 25mm long with its head driven flush with the top of the peg. Chainages, offset and reference elevation shall be clearly indicated to the sides of the peg to the satisfaction of the Engineer. After cutting of benches and prior to commencement of earthworks or subgrade works, Contractor shall take cross-sections again and submit the copy of the same to Engineer for agreement. These cross-sections shall then be used as basis of measurement for all subsequent layers, unless otherwise stated.
Detailed Setting Out. The contractor shall be responsible for the correct time and proper setting out of the work and for the correctness of the positions, levels, dimensions and alignments of all parts of the works and for the provisions of all necessary instruments, appliances and labour in connection therewith. If at any time during the progress of the works any error shall appear or arise in the position, levels, dimensions or alignment . of any part of the works the contractor on being required to do so by the Superintending Engineer shall at his own expenses rectify such error to the satisfaction of the Superintending Engineer. The checking of any setting out by the Superintending Engineer shall not in any way relieve the contractor of his . responsibility for the correctness thereof and the contractor shall carefully protect and preserve and bench marks, constructions stake and other thinks used in setting out the work.
Detailed Setting Out. Reference pegs shall be 50mm by 50mm in section 600mm long driven 400mm firmly into ground and painted white above the ground. The offset from centre line shall be indicated by small nail 20mm to 25mm long with its head driven flush with the top of the peg. Chainages, offset and reference elevation shall be clearly indicated to the sides of the peg to the satisfaction of the Engineer. After cutting of benches and prior to commencement of earthworks or subgrade works, Contractor shall take cross-sections again and submit the copy of the same to Engineer for agreement. These cross-sections shall then be used as basis of measurement for all subsequent layers, unless otherwise stated. Notwithstanding any indications to the contrary in the Standard specification the Engineer will not make available to the Contractor any land for quarries, borrow pits, stockpiles and spoil areas, except for those areas in road reserves specifically approved by him. The contractor will be entirely responsible for locating suitable sources of materials complying with the Standard and Special Specifications, and for the procurement, Wining, haulage to site of these materials and all costs involved therein. Similarly the contractor will be responsible for the provision and costs involved in providing suitable areas for stockpiling materials and spoil dumps. Should there be suitable sites for spoil dumps or stockpiles within the road reserve forming the site of the works the Contractor may utilise these subject to the approval of the Engineer. No additional payment will be made to the Contractor to cover costs arising from the requirements for this Clause and the Contractor must include these costs in the rates inserted into the Bills of Quantities.
Detailed Setting Out. Reference pegs shall be 50mm by 50mm in section 600mm long driven 400mm firmly into ground and painted white above the ground. The offset from centre line shall be indicated by small nail 20mm to 25mm long with its head driven flush with the top of the peg.

Related to Detailed Setting Out

  • Opting Out 6.1 The Opt-Out Deadline has Expired (1) The deadline to opt-out of the Proceedings expired on October 24, 2018, pursuant to Orders of the Ontario, BC and Québec Courts.

  • Lay-off Notice In cases of lay-off, the Company will give as much notice as possible.

  • CAFA Notice Pursuant to 28 U.S.C. § 1715, not later than ten (10) days after the Agreement is filed with the Court, the Settlement Administrator shall cause to be served upon the Attorneys General of each U.S. State in which Settlement Class members reside, the Attorney General of the United States, and other required government officials, notice of the proposed settlement as required by law, subject to Paragraph 5.1 below.

  • Cashing Out of Annual Leave (a) Paid Annual Leave must not be cashed out except in accordance with an agreement under clause 41.8. (b) Each cashing out of a particular amount of paid Annual Leave must be the subject of a separate agreement under clause 41.8. (c) The Employer and an Employee may agree in writing to the cashing out of a particular amount of accrued paid Annual Leave by the Employee. An agreement this clause must state: (i) the amount of Annual Leave to be cashed out and the payment to be made; and (ii) the date on which the payment is to be made. (d) An agreement under clause 41.8 must be signed by the Employer and Employee and, if the Employee is under 18 years of age, by the Employee’s parent or guardian. (e) The payment must not be less than the amount that would have been payable had the Employee taken the Annual Leave at the time the payment is made. (f) An agreement must not result in the Employee’s remaining accrued entitlement to paid Annual Leave being less than four (4) weeks. (g) The Employer must keep a copy of any agreement under clause 41.8 as an Employee record.

  • Estimated Number of Participating Households Approximately 6,460. This figure is based on loans with unpaid principal balances ranging from $200,000 to $400,000 with an average funding of $5,000.00.