Development Works Clause Samples

Development Works. Subject to any ownership rights of third parties pursuant to third party agreements to which Company is a party, [***]*
Development Works. 18 9.3 Provider License; No Other Licenses................................................... 18 9.4
Development Works. Around the building development works will be performed, including the supply of irrigation and planting according to the architect’s plan. All of the flooring of the upper parking lot (if any) will be of mixed stone or equivalent, according to the architect’s plan. Outside lighting according to the architect’s plan. [SIGNATURE AND STAMP] [SIGNATURE AND STAMP] BigBand Networks Ltd. U. ▇▇▇▇ Engineering Works Corp. Ltd. Company Number ▇▇-▇▇▇▇▇▇-▇ A. Plumbing and Fire Services 1. Preparation for water meter in each floor closet. 2. Fully equipped fire service booths in accordance with the specifications of the fire authority. Penetration with 2 inch pipe into the space of the Premises. 3. Sprinklers LH offices OH-1 parking lots OH -2 First floor, -1 Each floor shall have stopper, flow control and connection to the control. The system includes approval of the Standards Institute for planning and execution. 4. Garbage room includes water, tap and sewage point. Sewage connection includes oil separator. 5. Preparation for air conditioning drainage according to plans. 6. On first floor, toilet cubicle for disabled persons, suspended sink with hidden toilet tank. 7. Primary systems – fire hydrant system includes pumps and water tanks connection to essential system. Drainage system will include delivery lines connected to essential system. 8. Approval of the Standards Institute to the sprinkler system save for the interior divisions made by the Tenant. Approval of the authorities to the water and sewage connections by the Landlord. Disinfection of water tanks by an authorized sanitarian and according to the authorities’ specifications. Supply of device manual. 9. On each office floor one group of services will be performed by and at the expense of the Landlord, according to the following specification: - 20/20 or 30/30 tiling and covering of floor and ceramic walls up to the height of the ceiling. - Metal trays ceiling with combined PL lighting element, florescent bodies above mirrors inside channel. - Division with light walls or breeze block covered with ceramic. - Monoblock toilet seats, Hamat or Madgal manufactured taps and faucets. - Urinals in the mens’ toilets with automatic flush. - Oval earthenware basins (Harsa or Shava products) with ▇▇▇▇▇▇ ▇▇▇▇▇ surface.
Development Works. 5.1.1 Development works for the site are to be in accordance with the approved plans forming part of this Site Development Plan, as listed below: Proposed Development Concept Carparking Arrangement – Lot 909 N13071-SK02 ▇▇▇▇▇ Consulting Engineers 15.08.14
Development Works. Owner acknowledges that it is desirable to undertake development opportunities for the Shopping Centers in order to maximize investment returns and to maintain the standard and quality of each Shopping Center, and accordingly it may be appropriate to consider the advisability of constructing Development Works.
Development Works. The Developer must: (a) before commencing the Development Works, satisfy all applicable requirements of the Planning and Environment Act 1987; (b) before commencing the Development Works, at the Developer's cost, obtain all necessary permits, consents and other authorisations required by Law for the Development Works to proceed; (c) without limiting clauses 6.2(a) and 6.2(b), at all times meet the requirements of all relevant Laws relating to the commencement and completion of the Development Works; (d) at any time upon receipt of a written request from WW, provide WW with written evidence that the requirements of clauses 6.2 have been met; (e) at any time where requested by WW, coordinate the location and design of the proposed Development Works with any of WW's or any other governmental agency or utility provider’s existing or proposed works, operations or services; (f) ensure that the Contractor: (i) gives WW at least five Business Days' notice in accordance with WW's lodging requirements of any occasion upon which the Contractor proposes to work on the Development Works: (A) outside the hours of 7.30am to 4.00pm, Monday to Saturday; or (B) on a Sunday or public holiday; (ii) promptly advises WW if the Contractor vacates the site, and gives WW at least five Business Days' notice in accordance with WW's lodging requirements of the day on which the Contractor will resume the Development Works; (iii) as far as practicable, ensures that any excavation made as part of the Development Works is wholly contained within an easement, or land transferred, or proposed to be granted or transferred, to WW under clause 10 and that if any part of an excavation is not within an easement or transferred land referred to in clause 10, ensures that: (A) the Contractor promptly backfills such part of the excavation as is not contained within that easement or transferred land; or (B) the area of any easement or transferred land referred to in clause 10 is increased to include that part of the excavation; (iv) has in place, prior to the commencement of the Development Works and at all times during the completion of the Development Works: (A) a quality management system; (B) an environmental management system or procedures; and (C) an OHS management system or procedures, which meet the minimum standards under WW’s accreditation assessment process; and (v) complies with the systems or procedures prepared under clause 6.2(f)(iv) in carrying out construction of the Development Wor...
Development Works. 3.1. Implement all relevant sediment and erosion control measures and temporary fencing as identified on the approved engineering drawings for this development. Initially, those measures which are applicable prior to the commencement of the proposed development works must be implemented. Council’s Technical Officer will assess the sediment and erosion control measures and temporary fencing implemented, and any alterations and/or supplementary works required must be incorporated during the construction process. 3.2. Regularly monitor all sediment control devices and sediment collection points, remove sediment as necessary and maintain devices responsibly during construction and maintenance period of the development works. 3.3. Where vegetation is removed, dispose the vegetation waste by: 3.3.1. Milling; 3.3.2. Chipping and / or mulching; 3.3.3. Disposal at an approved waste disposal facility; and 3.3.4. Incineration of vegetation or waste at the site is not permitted. 3.4. Dispose waste other than vegetation waste, generated as a result of the operational works to an approved disposal facility via an approved waste receptacle and/or collection service. 3.5. During construction of this development, all vehicles (construction and private) must be parked within the development site at all times. 3.6. The applicant is responsible for protecting nearby property owners from dust pollution arising from the construction and maintenance of the works required by this approval and must comply with any lawful instruction from the Council if in his opinion a dust nuisance exists.
Development Works 

Related to Development Works

  • Development Work The Support Standards do not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Solutions, except such work as may be specifically purchased and outlined in Exhibit 1. CentralSquare retains all Intellectual Property Rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Development Program A. Development activities to be undertaken (Please break activities into subunits with the date of completion of major milestones) B. Estimated total development time

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection ▇▇▇▇▇; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • Research Program The term “