Drilling Procedures Sample Clauses

Drilling Procedures. The procedures set forth in Schedule 3.7 will be followed when drilling ▇▇▇▇▇ in a Mine Area after the Effective Time.
Drilling Procedures. A pilot hole shall be drilled on bore path per drawings with no deviations greater than five percent (5%) of depth over a span of one hundred feet (100'). If the pilot does deviate from the bore path more than five percent (5%) of depth in one hundred feet (100'), CONTRACTOR shall notify AVANGRID Engineer of any deviations and AVANGRID Engineer may require CONTRACTOR to pull-back and re- drill from the location along bore path before the deviation. In the event of a drilling fluid fracture, inadvertent returns or return loss occurs during pilot hole drilling operations, the CONTRACTOR shall cease drilling and wait at least thirty minutes, inject a quantity of drilling fluid with a viscosity exceeding 120 seconds as measured by a March funnel and then wait another thirty minutes. If mud fracture or returns loss continues, the CONTRACTOR will cease operations and notify the AVANGRID Engineer. AVANGRID Engineer and the CONTRACTOR will then discuss additional options and work will then proceed accordingly.
Drilling Procedures. In drilling and, where applicable, completing any well hereunder and connecting the same to the required gas transmission line, unless otherwise specified by Hesed, the Operator shall comply with the procedures set forth in Exhibit B attached hereto. The Operator will follow such of the foregoing steps as may be applicable in drilling and completing an oil well and will also take such actions as may be necessary or desirable, or otherwise specified by Hesed to permit the recovery and sale of oil there from if oil is discovered in marketable quantities.
Drilling Procedures. As there are many existing and potentially new methods for drilling and sampling that may be implemented on dams and levees, this regulation will not provide specific procedures. Most procedures are documented in applicable standards and reference documents. There are however, some general procedures that should be followed when using drilling fluids to limit the risk of damage. (1) Tools should be sized and designed to minimize the likelihood of the return flow clogging. Methods that require the cuttings to flow through a small annulus between the tools or casing and the borehole wall should not be used. (2) If possible, fluid discharges from the bit should be upward. A downward discharge increases the chance of clogging which could lead to a pressure spike. A lateral discharge into the sidewalls could lead to excessive disturbance or erosion. (3) Lower and raise drill tools slowly to avoid pressure changes in the drill hole; this is especially important when using tools with restricted annulus space below the groundwater table as the pressure changes are more severe and can lead to suction and surging problems. (4) Drilling feed rate must be slow enough to avoid crowding the bit and, thus, minimize the chance of inducing fracturing. The bit must be of a design such that pressure buildup is minimized. (5) Drilling media properties, pressure, and return should be continuously monitored. A floating needle pressure valve is required to record maximum pressure spikes that can occur instantaneously and are often unnoticed. (6) In some conditions, casing can be advanced ahead of the drilling bit to reduce the risk of hydraulic fracturing by confining the drilling fluids within the casing. (7) When core drilling rock, the embankment or foundation soil above top of rock must be protected and isolated from the circulating drilling fluid. Fractures in the bedrock must be considered as potential flow paths in contact with the overlying soil. (8) In situations where the presence of significant artesian pressure is suspected, which are common at the toe of dams, it may be necessary to use weighted drilling muds or raise the drill rig or install surface casing for pressure control along with the use of drilling mud. In some cases there may be a high risk of initiating internal erosion by drilling borings or excavating test pits in these areas. Emergency materials to stop progressive erosion in an excavation, a trench, or a borehole must be on site and readily available...

Related to Drilling Procedures

  • Billing Procedures The Supporting Party will bill the Protecting Party for actual costs incurred for Assistance by Hire. Reimbursements will be limited to the provisions of the Agreement and the applicable OP, regardless of whether or not it is authorized on the Resource Order or other documentation produced by the incident. Reimbursable costs may include transportation, salary, overtime, per diem and other approved expenses of supporting agency personnel. Rates and conditions of use for the equipment and personnel are documented in the OP. Parties shall submit a bill within 90 days of the incident. Parties must use their own invoice form for billing under this Agreement to avoid any confusion with other services that may have been ordered under other agreements. Invoices must identify Supporting Party’s name, address, and Taxpayer Identification Number (Department only), fire name, order and request number, and bill number and amount. Invoice supporting documentation must include description of services performed, period of services performed, and any applicable cost share agreements. Supporting documentation will itemize details of billing, listing personnel, equipment, travel and per diem, aircraft, supplies and purchases as approved in the attached OP. It will also include itemized deductions for maintenance and repair of equipment. Department invoices will include “Record of Activities” (FSLA-5) and U.S. Forest Service invoices will include transaction register. Invoices for services under this agreement must be sent to: ▇▇▇▇▇ ▇▇▇▇▇▇▇, FFMO ▇▇▇▇ ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Telephone: ▇▇▇-▇▇▇-▇▇▇▇ FAX: ▇▇▇-▇▇▇-▇▇▇▇ Email: ▇▇▇▇▇▇▇▇@▇▇.▇▇▇.▇▇ ▇▇▇ ▇▇▇▇▇▇▇▇, FIRE CHIEF ▇.▇. ▇▇▇ ▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Telephone: ▇▇▇-▇▇▇-▇▇▇▇ FAX: ▇▇▇-▇▇▇-▇▇▇▇ Email: ▇▇▇▇▇▇▇▇▇▇▇.▇▇▇▇@▇▇▇▇▇▇▇▇.▇▇▇ All bills will have a payment due date 30 days upon receipt. Contested ▇▇▇▇▇▇▇▇: Written notice that a bill is contested will be mailed to the Party within 30 days of receipt of the invoice and will fully explain the contested items. Contested items should be resolved no later than 60 days following receipt of the written notice. Parties are responsible for facilitating resolution of contested ▇▇▇▇▇▇▇▇. Billing requirements and rates are documented in the attached OP.

  • Testing Procedures The following test procedure shall apply to all urine tests administered to bargaining unit employees: a. Urine specimens shall be collected at the approved laboratory as stated below in section (e), or at an accredited medical facility when necessary after an accident. b. The employee shall not be observed when the urine specimen is given. c. All specimen containers, vials or bags used to transport the samples shall be sealed with evidence tape and labeled in the presence of the employee. d. The testing shall be done by another approved laboratory. e. The employer shall choose the testing/collection facility to be utilized for toxicology testing on a yearly basis. f. The following standards shall be used to determine what levels of detected substances shall be considered positive. Note: - These are current levels subject to change by Federally Mandated Regulations. Current Federal Regulations shall be controlling in case of change or conflict: DRUG SCREENING TEST CONFIRMATION Amphetamines 500 ng/ml Amphetamine 250 ng/ml GC-MS Marijuana Metabolites 50 ng/▇▇ ▇▇▇▇▇-THC 15 ng/ml GC-MS Cocaine Metabolites 150 ng/ml Metabolites 100 ng/ml GC-MS Opiates Morphine 2,000 ng/ml 2,000 ng/ml GC-MS PCP 25 ng/ml PCP 25 ng/ml GC-MS MDMA 500 ng/ml 250 ng/ml Alcohol .08 Breath .04 Breath – Employees with CDL .02 - .039 Breath - Employees with CDL will be removed from service for 24 hrs. g. Tests which are below the levels set forth above shall be determined as negative. If test results are negative, all non-required documentation regarding supervisors' observations and testing will be destroyed. h. At the time the urine specimen is collected two samples will be taken. One sample will be sent to the laboratory to be tested at the employer's expense. If the first sample tests positive then upon written request by the employee within twenty-four

  • BIDDING PROCEDURES 4.1. Bidders have to login at EHSAN AUCTIONEERS SDN. BHD. Website using the same registered email 30 minute before Auction Time. 4.2. Bidders have to click VIEW BID SCREEN BUTTON beside the status to show the bidding screen. Once enter the bidding screen bidders will be on STANDBY MODE 30 minute before the auction started. 4.3. Bidding shall generally commence based on the sequence of the lot being shown on the EHSAN AUCTIONEERS SDN. BHD. website. However, the Auctioneer has the right to vary this sequence without notice. 4.4. It shall be the responsibility of registered E-Bidders to log in through the EHSAN AUCTIONEERS SDN. BHD. website to wait for their turn to bid for the property lot in which they intend to bid. 4.5. The Auctioneer has the right to set a new reserve price in the event there is more than 1 bidder. The reference to a "bidder” here includes E-Bidders as well as on-site bidders. 4.6. Auctioneer will announce the amount of incremental bid and the same will appear on the website prior to the commencement of the auction. 4.7. “Standby mode” is displayed, followed by a message stating “AUCTION STARTED”. Enter your BID by clicking “NEXT BID” button. 4.8. Each bid will be called for 3 times, “FIRST CALLING, “SECOND CALLING”, “FINAL CALL”. Registered E-Bidders may submit their bid at any of these stages of biddings by click the bid amount. 4.9. Any bid by the registered E-bidders shall not be withdrawn once entered. 4.10. In the event of any clarification, disruption or special situation, the Auctioneer may at his discretion decide to pause, postpone and/or call off the public auction. The E-bidders will be notified of this on the BIDDING SCREEN. 4.11. When system displays “NO MORE BIDS”, no further bids will be accepted by the Auctioneer, whether on-site or through the EHSAN AUCTIONEERS SDN. BHD. website. 4.12. The bidder with the highest bid shall be declared as successful bidder upon the fall of hammer. 4.13. The decision of the Auctioneer shall be final and binding on all on-site and/or E-bidders. 4.14. A successful bidder will be directed to a page where further directions are given in order to conclude the sale of the auction property. Please also refer to Part 5 below. 4.15. Unsuccessful E-Bidders will have the deposit paid processed to be refunded to the same bank account from which the deposit transfer was made within three (3) working days. 4.16. The information shown and/or prompted on the screen handled by the EHSAN AUCTIONEERS SDN. BHD. website regarding the public auction, particularly to the calling of bidding price during the bidding process and the declaration of successful bidder shall be final and conclusive.

  • Closing Procedures Subject to satisfaction or waiver by the relevant Party of the conditions of Closing, on the Closing Date, the Sellers shall deliver actual possession of the Purchased Interest to the Purchaser and upon such delivery the Purchaser shall pay and issue the Purchase Price in accordance with Section 2.3.

  • Hiring Procedures Nothing contained in this Article 4 shall impair any of the rights of the Employer to hire new or additional employees to meet the employment needs of the Employer, in accordance with the terms and provisions of this collective bargaining Agreement or to meet the obligations of the Employer under Article 2, Section H of this Agreement or to take affirmative steps to comply with any requirements under any applicable Federal or State law prohibiting discrimination in employment.