DYNAMIC TESTS Sample Clauses

The 'Dynamic Tests' clause establishes the procedures and requirements for conducting tests that assess the performance or functionality of a product, system, or process under changing or variable conditions. Typically, this clause outlines the types of dynamic tests to be performed, the standards or protocols to be followed, and the responsibilities of each party in preparing for and executing the tests. For example, it may require that equipment be tested under simulated real-world operating conditions to verify compliance with contractual specifications. The core function of this clause is to ensure that the subject of the contract can reliably perform as intended in dynamic or fluctuating environments, thereby reducing the risk of failure in actual use.
DYNAMIC TESTS. 8.1.3.1. Tests on the trolley and test seat
DYNAMIC TESTS. For every 100 barrier faces produced, the manufacturer shall make one dynamic test against a dynamometric wall supported by a fixed rigid barrier, according to the method described below.
DYNAMIC TESTS. 11.2.1.1. Five child restraint systems shall be subjected to the dynamic test described in paragraph 8.
DYNAMIC TESTS. 2.1. The testing platform shall be mounted on a trolley.

Related to DYNAMIC TESTS

  • Acceptance Tests 11.1 If the Contract provides acceptance tests for Goods and/or the result of Services after their completion and/or delivery to the Purchaser, the acceptance shall only be considered as definitive when such tests have demonstrated the compliance of the Goods and/or the result of the Services to the requirements in the Contract. 11.2 Where the Contract provides for an acceptance procedure in the presence of both parties, at the successful completion of such procedure, the Purchaser shall issue the Supplier with an acceptance certificate which shall authorise the Supplier to invoice the Purchaser for any payment due on such acceptance. 11.3 The Purchaser shall at its discretion be entitled to issue and acceptancecertificate with reserves. The Supplier shall be obliged to remedy any non-conformities within the period set out in the acceptance certificate. Any payment which would otherwise have been due on acceptance may be withheld by the Purchaser in whole or part until the non- conformities underlying the reserves have been remedied.

  • Stability Testing Patheon will conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within [***], after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications and cGMPs. Patheon will give Client all stability test data and results at Client’s request.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.