End-of-Degree Program Assessment Clause Samples

End-of-Degree Program Assessment. All programs at OKCCC, including programs included in this Alliance, are also required to conduct assessment of the collective student performance relative to the overall program objectives. Each program assessment requires students to participate in both general education and discipline specific end-of-program assessment measures. The end-of-degree program assessment results will be reviewed by Alliance program faculty and administrators to improve the program’s effectiveness.

Related to End-of-Degree Program Assessment

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (▇▇▇▇▇://▇▇▇▇▇.▇▇▇.▇▇▇▇▇.▇▇.▇▇/tpasscmblsearch/index.jsp) or by contacting

  • INDEPENDENT SINGLE OR PROGRAM-SPECIFIC AUDIT If Grantee, within ▇▇▇▇▇▇▇’s fiscal year, expends a total amount of at least $750,000 in federal funds awarded, Grantee shall have a single audit or program-specific audit in accordance with 2 CFR 200. The $750,000 federal threshold amount includes federal funds passed through by way of state agency awards. If Grantee, within ▇▇▇▇▇▇▇’s fiscal year, expends a total amount of at least $750,000 in state funds awarded, Grantee must have a single audit or program-specific audit in accordance with TxGMS, State of Texas Single Audit Circular. The audit must be conducted by an independent certified public accountant and in accordance with 2 CFR 200 Government Auditing Standards, and TxGMS. For-profit Grantees whose expenditures meet or exceed the federal or state expenditure thresholds stated above shall follow the guidelines in 2 CFR 200 or TxGMS, as applicable, for their program-specific audits. Texas Health and Human Services Commission (HHSC) Single Audit Services will notify Grantee to complete the Single Audit Determination Form. If Grantee fails to complete the Single Audit Determination Form within 30 calendar days after notification by HHSC Single Audit Services to do so, then Grantee shall be subject to the DFPS sanctions and remedies for non-compliance with this Contract. Each Grantee that is required to obtain a single audit must competitively re-procure single audit services once every six years. Grantee shall procure audit services in compliance with this section and state procurement procedures as well as with the provisions of TxGMS.

  • E-Verify Program Grantee certifies that it utilizes and will continue to utilize the U.S. Department of Homeland Security's E-Verify system to determine the eligibility of: A. all persons employed to perform duties within Texas during the term of the Grant Agreement; and B. all persons, (including subcontractors) assigned by the Grantee to perform work pursuant to the Grant Agreement within the United States of America.

  • Advertisement on Project Highway The Project Highway or any part thereof shall not be used in any manner to advertise any commercial product or services.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and ▇▇▇▇▇▇▇▇▇. A detailed definition of the specific scope for Transmission Owner and Clinton and ▇▇▇▇▇▇▇▇▇ including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to ▇▇▇▇▇ and ▇▇▇▇▇▇▇ Substations on MWP-1 and the ▇▇▇▇ Substation on MWP-2. Clinton and ▇▇▇▇▇▇▇▇▇ will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and ▇▇▇▇▇▇▇▇▇ will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and ▇▇▇▇▇▇▇▇▇ will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and ▇▇▇▇▇▇▇▇▇. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and ▇▇▇▇▇▇▇▇▇. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.