Engineering, Design and Construction. The COPANO Facilities and HPL Operated Facilities shall be designed, installed, and constructed by COPANO in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”). A copy of the Standards (the most recent as of the date of this Agreement) is set forth in Exhibit "B" which is attached hereto and incorporated herein. HPL shall design, install and construct the HPL Facilities. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings or information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the COPANO Pipeline.
Appears in 1 contract
Sources: Interconnect and Operate Agreement
Engineering, Design and Construction. The COPANO HPL Facilities and the HPL Operated Facilities shall be designed, installed, and constructed by COPANO HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”)) and with sound and prudent natural gas industry practice. A copy of the Standards (the most recent as of the date of this Agreement) is set forth The BPE Facilities shall be designed, installed and constructed by BPE in Exhibit "B" which is attached hereto accordance with sound and incorporated herein. HPL shall design, install and construct the HPL Facilitiesprudent natural gas industry practice. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings or and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the COPANO PipelineBPE Plant.
Appears in 1 contract
Sources: Interconnect and Operate Agreement
Engineering, Design and Construction. The COPANO Facilities and HPL Operated Facilities shall be designed, installed, and constructed by COPANO HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”). A copy of The Southern Facilities shall be designed, installed, and constructed by Southern or its designee in accordance with Engineering Standards as adopted by Southern, as the Standards same may be amended from time to time (the most recent as of the date of this Agreement) is set forth in Exhibit "B" which is attached hereto and incorporated herein. HPL shall design, install and construct the HPL FacilitiesSouthern Standards"). The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic or nitrogen testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings or information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the COPANO Southern Pipeline.
Appears in 1 contract
Sources: Interconnect Agreement