Engineering, Design and Construction. The HPL Facilities shall be designed, installed, and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”). The BVP Facilities shall be designed, installed and constructed by BVP or its designee in accordance with sound and prudent natural gas industry practice. The HPL Operated Facilities shall be designed, installed and constructed by BVP or its designee in accordance with the Standards and with sound and prudent natural gas industry practice. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the BVP Plant.
Appears in 1 contract
Sources: Interconnect and Operate Agreement
Engineering, Design and Construction. The HPL Facilities shall be designed, installed, and constructed by HPL or its designee in accordance with Engineering Standards as adopted by Enron Operations Corp., as the same may be amended or supplemented from time to time (the “Standards”). The BVP RNP Facilities shall be designed, installed and constructed by BVP RNP or its designee in accordance with sound and prudent natural gas industry practice. The HPL Operated Facilities shall be designed, installed and constructed by BVP HPL or its designee in accordance with the Standards and with sound and prudent natural gas industry practice. The Parties may conduct onsite inspections of the other Party's portion of the Interconnect during and after construction. Upon request by a Party, the other Party shall provide the following: (i) the welder’s test for buttwelds and branch welds; (ii) the fabrication and radiographic inspection; (iii) hydrostatic testing documentation; (iv) OPP documentation, as applicable; and (v) as-built drawings and information. The Parties shall arrange a mutually agreeable schedule for the tie-in of the Interconnect with the HPL Pipeline and the BVP RNP Plant.
Appears in 1 contract
Sources: Interconnection Agreement