EROSION CONTROLS Clause Samples

EROSION CONTROLS. The Contractor will at its expense take such reasonable steps to avoid soil erosion as may be prescribed by ALEMA. Should ALEMA prescribe such measures, no building work will be undertaken or continued by the Contractor until the measures have been fully implemented and approved of by ALEMA.
EROSION CONTROLS. 6.1. The Contractor shall ensure that all necessary erosion control measures are undertaken in collaboration with SEEHOA to ensure that erosion is avoided. 6.2. All control measures are to comply with the relevant SEEHOA protocols.
EROSION CONTROLS. The Contractor shall ensure all erosion control measures are undertaken in collaboration with the Estate Manager or Landscape Consultant, to ensure erosion is avoided. Sand bags and berms are to be placed where necessary to prevent erosion, particularly over weekends and holiday periods. Please refer to the requirements in terms with the Environmental Management Plan. The Landscaper will be responsible for all areas handed over to him/her
EROSION CONTROLS. Temporary erosion and sedimentation controls complying with Section 1.4.0 of the City of Austin Environmental Criteria Manual ("Erosion Controls") will be erected on the Land in connection with development and construction on the Land. However, if at any time after the Effective Date, the City promulgates new criteria for Erosion Controls on a uniform basis throughout its planning jurisdiction (as defined in the Austin City Code), then erosion and sedimentation controls will be erected on the Land in accordance with such new criteria for site development permits, building permits, and other development and construction permits issued after the effective date of the revised criteria for temporary erosion and sedimentation controls.
EROSION CONTROLS. 10.1 The Principal Contractor will install temporary construction entrances, fences, and other erosion control methods considered necessary immediately upon the building site / building footprint being cleared. All erosion control measures must be undertaken in collaboration with the Estate Manager, or the Landscape Consultant, so as to ensure erosion is avoided. Sand bags are to be placed where necessary to prevent erosion, particularly over weekends, holidays, and extended closure periods. This must be done in line with the Estate’s nominated Environmentalist’s recommendations. 10.2 Due to the presence of sub-soils consisting of primarily windblown sand and coupled with strong winds both from the east and the south west the removal of vegetation on the building site is discouraged. The removal of this ‘grubbing layer’ can cause the ▇▇▇▇▇ subsoil to be blown easily during periods of high wind. If this layer is removed then adequate precautions must be taken to arrest windblown sand by layering these exposed areas with thatch and regular watering. Sites which in the view of the IRHOA which cause excessive dust will be required to mitigate this problem failing such the IRHOA will stop all works until the situation is remedied to the satisfaction of the IRHOA. 10.3 The Principal Contractor must inspect the site and ensure that the erosion control methods that are in place are maintained and adequately serve their function. This inspection must be carried out on a regular basis. 10.4 IRHOA management will carry out regular site inspections and assess the erosion control management, and if in their opinion, find that it is not adequate, will instruct the Contractor to carry out remedial work and improve his/her erosion control management within a certain time period, and to maintain the standard throughout the construction period. 10.5 All retaining walls, if required shall be constructed as soon as possible. In order to obtain the necessary completion certificate from the IRHOA a certificate will have to be obtained from a professional civil engineer
EROSION CONTROLS. The contractor will at its expense take such reasonable steps to avoid soil erosion as may be prescribed by SHOA. Should the HOA prescribe such measures, no building work will be undertaken or continued by the contractor until the measures have been fully implemented and approved.

Related to EROSION CONTROLS

  • Erosion Control a. The Purchaser shall construct slash and debris erosion barriers, dips, water bars or ditches in skid trails and landings as directed by the Forest Officer. b. The kinds and frequency of erosion control structures shall be adjusted to soil types, topography and climatic conditions as directed by the Forest Officer. c. The Purchaser is required to recontour any excavated skid trails, and provide for effective erosion control in the trail location as directed by the Forest Officer. d. Erosion control work shall commence as soon as skidding is completed on each skid trail or landing, and must be kept current with unit operations. e. Erosion control work shall be completed and approved by the Forest Officer in unfinished units before operations cease for inactive periods including heavy winter snowfall, spring breakup and restricted dates. f. All erosion control work in each unit shall be completed prior to notification pursuant to Section VII.M.7.

  • Plan Controls The terms contained in the Plan are incorporated into and made a part of this Agreement and this Agreement shall be governed by and construed in accordance with the Plan. In the event of any actual or alleged conflict between the provisions of the Plan and the provisions of this Agreement, the provisions of the Plan shall be controlling and determinative.

  • Access Controls a. Authorized Access - DST shall have controls that are designed to maintain the logical separation such that access to systems hosting Fund Data and/or being used to provide services to Fund will uniquely identify each individual requiring access, grant access only to authorized personnel based on the principle of least privileges, and prevent unauthorized access to Fund Data. b. User Access - DST shall have a process to promptly disable access to Fund Data by any DST personnel who no longer requires such access. DST will also promptly remove access of Fund personnel upon receipt of notification from Fund.

  • TIA Controls If any provision of this Indenture limits, qualifies, or conflicts with another provision which is required to be included in this Indenture by the TIA, the required provision shall control.

  • Indenture Controls If and to the extent that any provision of the Notes limits, qualifies or conflicts with a provision of this Indenture, such provision of this Indenture shall control.