Evaluation Methodology Sample Clauses
Evaluation Methodology. 5.1. The Evaluator shall use a documented and evidence-based methodology which meets the requirements of ISO/IEC 19011, or equivalent. This shall include adequate checks of relevant documentation, operating procedures and records of the operations of the organisations responsible for implementing the TLAS, identification of any cases of non-compliance and system failures, and issuance of requests for corresponding corrective action.
5.2. The Evaluator shall, inter alia:
(a) Review the process for accreditation of Independent Assessment and Verification Bodies (LP and LV);
(b) Review documented procedures of each body involved in TLAS implementation controls for completeness and coherence;
(c) Examine implementation of documented procedures and records, including work practices, during visits to offices, forest harvesting areas, log yards/log ponds, forest checking stations, mill sites and export and import points;
(d) Examine information collected by the regulatory and enforcement authorities, LPs and LVs and other bodies identified in the TLAS to verify compliance;
(e) Examine data collection by private sector organisations involved in TLAS implementation;
(f) Assess the availability of public information set out in Annex IX including the effectiveness of information disclosure mechanisms;
(g) Make use of the findings and recommendations of Independent Monitoring and Comprehensive Evaluation reports, as well as reports of the Independent Market Monitor;
(h) Seek the views of stakeholders and use information received from stakeholders who are either directly or indirectly involved in the implementation of the TLAS; and
(i) Use appropriate sampling and spot check methods to evaluate the work of the forest regulatory agencies, LPs and LVs, industries, and other relevant actors at all levels of forest activities, supply chain control, timber processing and export licensing, including cross checks with information on timber imports from Indonesia provided by the Union.
Evaluation Methodology. The methodology reviewed for the evaluation of the reserves is the JORC (Joint Ore Reserves Committee).
Evaluation Methodology. The evaluation of the bids will be done in a two-stage process. Bidders who do not meet the Stage 1 {(Administrative Compliance Requirements (completion or attachment of Compulsory documents)}, of the evaluation shall not be considered for Stage 2 evaluation (Price and B-BBEE).
1. Declaration of Interest form (ECBD 4) 2. Signing of Declaration of Bidder’s Past Supply Chain Management Practices (ECBD 8);
Evaluation Methodology a. In addition to all items highlighted under Page 2 titled “Very Important Notice on Disqualifications”, the tenders will be evaluated in terms of the Municipality Supply Chain Management policy, Preferential Procurement Framework Act (Act 5 of 2000) and its regulations as enacted in 2001.
b. Tenders will be evaluated using the 80/20 points allocation system. The total points out of a possible maximum of 100 will be calculated using various formulae to calculate price as well as for preferential procurement.
Evaluation Methodology. (1) Methodology for Evaluation and Award shall also include price evaluation based on overall lowest evaluated price (L-1) basis.
(2) The evaluated price of bidders shall include the following:
(i) Ex-works price quoted by the bidder (including packing, forwarding, and GST on components and raw materials but excluding Inland Transportation to Delivery Location) including cost of Inspection by Third Party Agency, mandatory spares etc. (wherever applicable).
(ii) Inland transportation up to Delivery location and other costs incidental to delivery of goods
(iii) GST (CGST & SGST/UTGST or IGST) on the finished goods including inland transportation (i.e. on sl. no. i and ii above)
Evaluation Methodology. FACTOR 1:– TECHNICAL APPROACH (VOLUME I)
a. The Offeror’s proposed Configuration Management (CM) process will be evaluated to determine the level of process documentation and the application of CM in support of, at a minimum, SOW paragraph 12; to determine the Offeror’s understanding of the CM requirements for this acquisition; and to determine whether the Offeror’s CM process and experience on programs of similar size and complexity are adequate to satisfy the requirements in this solicitation.
b. The Offeror’s proposed process(es) and experience in managing engineering changes or deviations to the TDP and controlling the insertion of those changes into the production line will be evaluated to determine the Offeror’s demonstrated ability to understand and address engineering changes and updated production requirements, at a minimum, SOW paragraph 12.4. In addition, the Offeror will be evaluated on its approach in updating and verifying production line changes and processes.
c. The Offeror’s Quality Assurance (QA) process will be evaluated to verify that it is ANSI/ASQC Q9001 or ISO 9001 or equivalent, certified, to determine the level of process documentation and the level of compliance, at a minimum, with SOW paragraph 19. The Offeror’s FACAR system will be evaluated to determine its capability to support the requirements of SOW paragraph 12.5.
Evaluation Methodology. 6.1 Applications will be subjected to the minimum documents submitted and complete as listed in Section 5 to determine which service providers are compliant or non-compliant.
6.2 Only those applications that are fully complaint and whose submissions have been verified will be listed on the database and be eligible to submit quotations for programmes or services as the need arises.
Evaluation Methodology. The Government will assess all responsive proposals against the solicitation requirements and criteria defined by the evaluation factors below.
Evaluation Methodology. Method to evaluate compliance with the obligations of the CONCESSIONAIRE for the renewal of the CONCESSION, as approved by Supreme Decree No. 008-2021-MTC or rule that modifies, replaces or substitutes it.
Evaluation Methodology. The evaluation methodology to be used in the project will consist of an expert-based evaluation, a user-based evaluation in a controlled environment, and a user-based evaluation at the elderly home. The methodology will further provide a combination of recognized qualitative and quantitative usability analysis methods to report the findings, covering the project’s pre-trials as well as the project’s final trial. Qualitative analysis components such as user personal comments and expert observations will be used. For the quantitative analysis of the system, questionnaires which will be filled in by the end users as well as their caregivers were constructed (see Appendix A and Appendix B). The pre-trials questionnaires are simpler, as certain features of the complete system will not be possible to asses due to their prototype nature. However, the trial questionnaires, along with automatically gathered measurements will provide a full picture for every indicator mentioned in section 4.2. Furthermore, a selection questionnaire (see Appendix C) will be used to ensure that the end users sample participating in the trials will be representative of the general target audience of the system. The constructed questionnaires incorporate elements of standardized and validated questionnaires adapted to our system. In detail, the trials and pre-trial questionnaires comprise of questions adapted from the System Usability Scale (SUS) and User Success Rate (USR) [1] [2], which are widely used to assess the usability of a system. Parts of Social Presence questionnaires were used in order to measure the realism and the engagement involving the avatar system [3] [4] as well as the Perception of the Personality of the avatar by the user [5]. Furthermore, questions aiming to gauge the Quality of Life of the end user were adapted and included from the Q-LES-Q-SF (Quality of Life Enjoyment and Satisfaction Questionnaire – Short Form) questionnaire. In order to access the indicators of objective 5, the ▇▇▇▇▇ ▇▇▇▇▇▇ Interview (ZBI) questionnaire, which aims in assessing the reduction of the burden of care of the caregivers, was adopted (mainly for the trial questionnaire).