Existing Signal Timing. The consultant shall obtain the existing signal timing sheets from the local maintaining agency to in order to develop a base analysis model. Key information from the existing signal timing includes phase sequence, yellow and all-red intervals, pedestrian walk and flashing don’t walk intervals, minimum green, and detector settings. Additionally, if the intersection is operating in coordination, then the cycle length, splits and/or force-offs, offsets, and reference phases should be obtained from the existing signal timing.
Appears in 2 contracts
Sources: Safety Program Agreement, Districtwide Traffic Operations Safety Studies Scope of Services