Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.
System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.
System Use (a) An electronic site access system may be used on site, subject to the requirements of this statement. (b) The system operates via: (i) a facial recognition device; and (ii) an electronic gate. (c) The system will be installed at the access and egress point/s of the site and will only be utilised to identify presence on site. (d) The purpose for which the electronic site access system will be implemented is to ensure: (i) avoiding unauthorised access to site; (ii) confirmation and co-ordination of effort in emergency situations; and (iii) confirmation that all entrants to site have received a site specific induction; (e) The only personal data collected by the system is a site entrant’s: (i) image; (ii) first & last name; (iii) mobile phone number; (iv) email address; and (v) employer’s name. (the Collected Data) (f) The Collected Data will only be held or used for the purposes specified above, unless otherwise by consent or required by law. (g) The Employer will not use the electronic site access control system to verify who was on a site at a particular time for the purpose of: (i) evaluating whether a variation claim regarding labour costs made by a subcontractor can be substantiated; (ii) taking disciplinary action against an Employee, or assisting a subcontractor to take disciplinary action against its own employees, regarding their start and finish times; or (iii) otherwise generally tracking a worker’s movements whilst on the site.
System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.
Use of School Facilities 1. The Association will have the right to use school buildings at reasonable times for meetings in accordance with Committee policy on the Use of School Facilities. The principal of the building in question will be notified in advance of the time and place of all such meetings. 2. There will be one (1) bulletin board in each school building, which will be placed in the faculty lounge, for the purpose of displaying professional notices, circulars, and other Association material. Copies of all such material will be given to the building principal, but his advance approval will not be required.