For Project Correspondence, the Engineer shall Sample Clauses

This clause assigns responsibility to the Engineer for managing all project-related correspondence. In practice, this means the Engineer is tasked with receiving, sending, and maintaining records of communications between the parties involved in the project, such as contractors, clients, and consultants. By centralizing correspondence duties with the Engineer, the clause ensures clear communication channels and helps prevent misunderstandings or disputes arising from mismanaged or lost information.
For Project Correspondence, the Engineer shall a. Upon receipt of written correspondence from the contractor, draft a response within five (5) working days for the State to review, comment, approve and sign. The Engineer shall track all correspondence, approved or outstanding. All informal correspondence should be sent to the State via e-mail. All formal correspondence should be sent on the Engineer’s letterhead. b. Manage project issues and work directly with the contractor as directed in writing by the State. c. Escalate any major project issues to the State. d. Copy the State’s Project Manager (PM) on all internal and external correspondence.
For Project Correspondence, the Engineer shall a. Upon receipt of written correspondence from the contractor, draft a response within five (5) working days for the State to review, comment, approve and sign. The Engineer shall track all correspondence, approved or outstanding. All informal correspondence should be sent to the State via e-mail. All formal correspondence should be sent on the Engineer’s letterhead. DocuSign Envelope ID: 55FE2BFC-CA39-480D-97BD-9DF0F5D6F18E b. Manage project issues and work directly with the contractor as directed in writing by the State. c. Escalate any major project issues to the State within 24 hours. d. Copy the State’s Project Manager (PM) on all internal and external correspondence.
For Project Correspondence, the Engineer shall a. Upon receipt of written correspondence from the contractor, draft a response within five (5) working days for the State to review, comment, approve and sign. The Engineer shall track all correspondence, approved or outstanding. The Engineer shall send all informal correspondence should be sent to the State via e-mail. The Engineer shall send all formal correspondence to the State on the Engineer’s letterhead. b. Manage project issues and work directly with the contractor as directed in writing by the State. c. Escalate any major project issues to the State. d. Copy the State’s Project Manager (PM) on all internal and external correspondence.

Related to For Project Correspondence, the Engineer shall

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.