Manufacturing Technology Transfer Except as provided in Section 4.3(f)(iii)(1) and Section 6.10, with respect to any Collaboration Product (or LGC Reserved Product, if applicable) for which LGC (or its Affiliate) performed CMC Development or CMC Manufacturing, if (a) Cue does not elect for LGC to perform CMC Step 2, CMC Step 3, or CMC Step 4 (or with respect to LGC Reserved Products, upon completion of CMC Step 1), or (b) upon failure of the Parties to reach agreement with respect to a Clinical Supply Agreement or a Commercial Supply Agreement or (c) [***] under this Agreement and does not cure such breach within [***] days (provided, that if such breach is not reasonably capable of cure within such [***] day period, then such cure period shall be automatically extended for an additional [***] day period as long as LGC continues to use diligent efforts to cure such breach in accordance with a reasonable cure plan and if such breach is not reasonably capable of cure within such combined [***] day period, then Cue shall reasonably consider consenting to any extension of such cure period as long as LGC continues to use diligent efforts to cure such breach in accordance with a reasonable cure plan), as applicable, then, in each case upon the written request of Cue, LGC shall use Commercially Reasonable Efforts to make a technology transfer to an Approved CMO the Manufacturing processes (including materials and such other information) but solely as is necessary to enable the Manufacture of such Collaboration Product (including the Collaboration Compound therein) (or LGC Reserved Product, including the LGC Reserved Compound therein, if applicable) by such Approved CMO to comparable biochemical structure, quality and purity as that Manufactured by LGC or its Affiliate or CMO, provided that neither Cue, LGC or any Third Party shall perform such a technology transfer to any CMO [***] without LGC’s consent, not to be unreasonably withheld, conditioned or delayed if LGC has approved the CMO to manufacture Collaboration Products (or LGC Reserved Products, if applicable). LGC shall conduct such technology transfer as soon as reasonably practicable after receiving such written notice, using good faith efforts to support supply needed to achieve timelines in the Cue Territory Development Plan (or Cue’s development plan for LGC Reserved Products, if applicable) or Cue Territory Commercialization Plan, as applicable. LGC shall conduct the first technology transfer for each Collaboration Product (or LGC Reserved Products, if applicable) [***] (provided that [***]) for a period of up to [***] months from the date Cue or its designee has provided notice it is ready to receive the technology transfer, provided, that such [***] month period [***]. After the expiration of the initial such [***] month period for a Collaboration Product (or LGC Reserved Products, if applicable), if required to complete the technology transfer to enable the Manufacture of such Collaboration Product (including the Collaboration Compound therein) (or LGC Reserved Product, including the LGC Reserved Compound therein, if applicable) by such Approved CMO to comparable biochemical structure, quality and purity as that Manufactured by LGC, LGC shall continue to provide support to Cue for up to an additional [***] period for up to [***] hours at the FTE Rate and thereafter at [***]. Thereafter, LGC will also provide [***] for such Collaboration Product (or LGC Reserved Products, if applicable). Neither Cue nor its Affiliates or Cue Collaborators shall reverse engineer any materials provided hereunder by LGC. Notwithstanding anything in this Agreement to the contrary, LGC’s CMC information may only be shared with an Approved CMO.
Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.
SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 4.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work. 4.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4.12.4 The Contractor shall review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the State or any separate contractor, all Shop Drawings, Product Data and Samples required by the Contract Documents. 4.12.5 By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he / she has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he / she has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 4.12.6 The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data or Samples under Subparagraph 2.2.7 of these General Conditions unless the Contractor has specifically informed the Architect and the State in writing of such deviation at the time of sub- mission and the Architect and the State has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Architect's approval thereof. 4.12.7 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Architect on previous submittals. 4.12.8 No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Architect as provided in Subparagraph 2.2.7 of these General Conditions. All such portions of the Work shall be in accordance with approved submittals.
Third Party Components The Products and Services may contain third party components (including open source software) subject to separate license agreements. To the limited extent a third party license expressly supersedes this ▇▇▇▇, such third party license governs Customer’s use of that third party component.
Background Technology List here prior contracts to assign Inventions that are now in existence between any other person or entity and you.