Future PaCSWG Work Programme Sample Clauses

Future PaCSWG Work Programme. 9.2.1 The Work Programme of the PaCSWG is outlined in sections 2 and 5 of the AC Work Programme (ANNEX 4). The Committee endorsed this Work Programme following discussion under Agenda Item 12.1.
Future PaCSWG Work Programme. 10.2.1 The Committee endorsed the Working Group’s 2015 Work Programme (AC8 Doc 16 Rev 3) and its proposed 2016-2018 Work Programme (AC8 Doc 17 Rev 3) following discussion under Agenda Items 13.1 and 13.2 respectively.
Future PaCSWG Work Programme. 11.2.1 The Advisory Committee discussed the PaCSWG’s Work Programme for the current triennium and its proposed 2019 - 2021 Work Programme under Agenda Items 14.1 and 14.2 respectively.

Related to Future PaCSWG Work Programme

  • Work Progress The Developer and Connecting Transmission Owner will keep each other, and NYISO, advised periodically as to the progress of their respective design, procurement and construction efforts. Any Party may, at any time, request a progress report from the Developer or Connecting Transmission Owner. If, at any time, the Developer determines that the completion of the Connecting Transmission Owner’s Attachment Facilities will not be required until after the specified In-Service Date, the Developer will provide written notice to the Connecting Transmission Owner and NYISO of such later date upon which the completion of the Connecting Transmission Owner’s Attachment Facilities will be required.

  • PROJECT WORK PLAN The Statement of Work is the formal document incorporated into the Grant. The Project Work Plan documents how the Grantee will achieve the performance measures outlined in the Grant. Changes to the Statement of Work require an amendment. Project Work Plans may be changed with written approval from DFPS and the Grantee.

  • Supplier Development lf the Buyer identifies problems in supplier performance based on supplier monitoring, he shall initiate improvement measures at the Supplier. The Buyer shall pursue the possibilities of continuous improvement of the Supplier. The supplier audit is a form of supplier development; the exchange of information and experience between the Buyer and the Supplier also serves this purpose.

  • WORK PRODUCT/PRE-EXISTING WORK PRODUCT OF CONTRACTOR Any and all work product resulting from this Contract is commissioned by the County of Marin as a work for hire. The County of Marin shall be considered, for all purposes, the author of the work product and shall have all rights of authorship to the work, including, but not limited to, the exclusive right to use, publish, reproduce, copy and make derivative use of, the work product or otherwise grant others limited rights to use the work product. To the extent Contractor incorporates into the work product any pre-existing work product owned by Contractor, Contractor hereby acknowledges and agrees that ownership of such work product shall be transferred to the County of Marin.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.