GENERATING PLANT Clause Samples

The 'Generating Plant' clause defines the specific facility or installation where electricity is produced for the purposes of the agreement. This clause typically identifies the location, capacity, and technical characteristics of the plant, and may include details such as the type of generation technology used (e.g., solar, wind, gas) and its operational status. By clearly specifying the generating plant, the clause ensures that both parties understand which facility is subject to the contract, thereby preventing disputes over the source of electricity and clarifying the obligations related to energy delivery.
GENERATING PLANT. GENERATING UNIT DATA UNIT
GENERATING PLANT. 1.1 Operation and maintenance costs shall include the following expenses to the extent that they are charge-able to the Navajo Generating Station in accordance with sound accounting practice: 1.1.1 The operation expenses chargeable to FPC Accounts 500, 502, 503, 504, 505, 506, 507, 556, 557 and any costs in the following FPC Accounts pertaining to load dispatching: 1.1.1.1 560, 561, 562, 566 and 567. 1.1.2 The maintenance expenses chargeable to FPC Accounts 510 through 514, inclusive, and any costs in the following FPC Accounts pertaining to load dispatching: 1.1.2.1 568, 569, 570 and 573. 1.1.3 Overhead expenses included in Sections 1.1.1 and 1.1.2 of this Exhibit F incurred by the Operating Agent which are allocable to the operation and maintenance of the Navajo Generating Station. Such overhead expenses shall be determined in accordance with the following allocation procedure: 1.1.3.1 Overhead expenses of the Operating Agent applicable to the Navajo Generating Station operation and maintenance expenses will be generated at two sources: 1.1.3.1.1 The salaries and expenses of the Operating Agent's functional area responsible for power supply and system operations, the supervisory, administrative and clerical staff, including members of the staff that perform system protection, operation and production functions, including appropriate system dispatching costs. 1.1.3.1.2 The salaries and expenses of the Operating Agent's supervisor of steam generation, if not included within Section 1.1.3.1.1 of this Exhibit F, and his supervisory, administrative, engineering and clerical staff.
GENERATING PLANT. XXXXXXXXXXXXXX
GENERATING PLANT. 1.1 Operation and maintenance costs shall include the following expenses to the extent that they are charge-able to the Navajo Generating Station in accordance with sound accounting practice: 1.
GENERATING PLANT. GENERATING UNIT DATA UNIT GENERATOR TRANSFORMER DATA UNIT 10. DESIGN FAULT LEVEL 11. MAXIMUM FAULT CONTRIBUTION FROM [XXX]

Related to GENERATING PLANT

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Generators Temporary installation of generators, and permanent installation of generators that are placed inside existing non-residential buildings or that occupy an area under 50 square feet behind the building they serve.

  • Access to Project Site ‌ City will make available, no later than the commencement date designated in the current construction Schedule accepted by City, the lands and facilities upon which the Work is to be performed, including such access and other lands and facilities designated in the Contract Documents, for use by Contractor.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.