Identification of Interregional Transmission Projects by Stakeholders. Stakeholders may propose projects that may be more efficient or cost-effective than projects included in the SERTP Transmission Providers’ and the Office of the Interconnection’s regional transmission plans pursuant to the procedures in each region’s regional transmission planning processes. The SERTP Transmission Providers and Office of the Interconnection will evaluate interregional transmission projects proposed by stakeholders pursuant to sSection 3.3 below.

Related to Identification of Interregional Transmission Projects by Stakeholders

  • Transmission and Routing of Telephone Exchange Service Traffic 50.4.1 The Appendix Reciprocal Compensation, which is/are attached hereto and incorporated herein by reference, prescribe traffic routing parameters for Local Interconnection Trunk Group(s) the Parties shall establish over the Interconnections specified in the Appendix ITR, which is/are attached hereto and incorporated herein by reference.

  • Submission of Grievance Information a. Upon appointment of the arbitrator, the appealing party shall, within five (5) days after notice of appointment, forward to the arbitrator, with a copy to the School Board, the submission of the grievance which shall include the following: 1. The issues involved. 2. Statement of the facts. 3. Position of the grievant. 4. The written documents relating to Section 5 of the grievance procedure.

  • Information Submission by Connecting Transmission Owner The initial information submission by Connecting Transmission Owner shall occur no later than one hundred eighty (180) Calendar Days prior to Trial Operation and shall include New York State Transmission System information necessary to allow the Developer to select equipment and meet any system protection and stability requirements, unless otherwise mutually agreed to by the Developer and Connecting Transmission Owner. On a monthly basis Connecting Transmission Owner shall provide Developer and NYISO a status report on the construction and installation of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades, including, but not limited to, the following information: (1) progress to date; (2) a description of the activities since the last report; (3) a description of the action items for the next period; and (4) the delivery status of equipment ordered.

  • CERTIFICATION REGARDING CERTAIN FOREIGN-OWNED COMPANIES IN CONNECTION WITH CRITICAL INFRASTRUCTURE (Texas law as of September 1, 2021) By submitting a proposal to this Solicitation, you certify that you agree to the following required by Texas law as of September 1, 2021: Proposing Company is prohibited from entering into a contract or other agreement relating to critical infrastructure that would grant to the company direct or remote access to or control of critical infrastructure in this state, excluding access specifically allowed by the Proposing Company for product warranty and support purposes. Company, certifies that neither it nor its parent company nor any affiliate of company or its parent company, is (1) owned by or the majority of stock or other ownership interest of the company is held or controlled by individuals who are citizens of China, Iran, North Korea, Russia, or a designated country; (2) a company or other entity, including governmental entity, that is owned or controlled by citizens of or is directly controlled by the government of China, Iran, North Korea, Russia, or a designated country; or (3) headquartered in China, Iran, North Korea, Russia, or a designated country. For purposes of this contract, “critical infrastructure” means “a communication infrastructure system, cybersecurity system, electric grid, hazardous waste treatment system, or water treatment facility.” See Tex. Gov’t Code § 2274.0101(2) of SB 1226 (87th leg.). The company verifies and certifies that company will not grant direct or remote access to or control of critical infrastructure, except for product warranty and support purposes, to prohibited individuals, companies, or entities, including governmental entities, owned, controlled, or headquartered in China, Iran, North Korea, Russia, or a designated country, as determined by the Governor.

  • Points of Interconnection and Trunk Types 2.1 Point(s) of Interconnection. 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by Covista.