Common use of INSTALLATION SITES Clause in Contracts

INSTALLATION SITES. The following is a description of the pre-approved modifications and additions per roadway: Fort Bend Parkway includes a relocation of a proposed site which requires a new 55’ pole. Westpark Tollway includes three pole relocations and three sites which require fiber work and new switches to connect to the existing fiber network. Grand Parkway includes three additional sites and one pole relocation from Westpark Tollway. Modifications to pre-approved sites include new 55’ poles and a relocation of the CCTV camera to improve visibility along the roadway. The ▇▇▇▇ of Materials table contains the Change Order quantities including requested spare parts. A detailed list of site-specific equipment can be found in Table 2. Supplemental Agreement No. 6 To Agreement of November 15, 2017 Below is the modified ▇▇▇▇ of materials for proposed Change Order speed and volume detection sites specific to the three Fort Bend managed roadways. 6 270W Solar panel with bracket (SPM1X270-BK, and harness (OP-100FT-T4) EA 4.00

Appears in 1 contract

Sources: Supplemental Agreement

INSTALLATION SITES. The following is a description of the pre-approved modifications and additions per roadway: Fort Bend Parkway includes a relocation of a proposed site which requires a new 55’ pole. Westpark Tollway includes three pole relocations and three sites which require fiber work and new switches to connect to the existing fiber network. Grand Parkway includes three additional sites and one pole relocation from Westpark Tollway. Modifications to pre-approved sites include new 55’ poles and a relocation of the CCTV camera to improve visibility along the roadway. The ▇▇▇▇ Bill of Materials table contains the Change Order quantities including requested spare parts. A detailed list of site-specific equipment can be found in Table 2. Supplemental Agreement No. 6 To Agreement of November 15, 2017 Below is the modified ▇▇▇▇ bill of materials for proposed Change Order speed and volume detection sites specific to the three Fort Bend managed roadways. 6 270W Solar panel with bracket (SPM1X270-BK, and harness (OP-100FT-T4) EA 4.00

Appears in 1 contract

Sources: Supplemental Agreement