Interconnection Facility. 3.1.1 JPS shall determine the Point of Interconnection on the distribution network for the QF. The QE shall identify the additional interconnection facilities necessary to interconnect the QF to JPS’ distribution network that is to be itemized in Exhibit D. 3.1.2 The QE is responsible for the design, installation, operation, maintenance and ownership of the interconnection facilities. 3.1.3 The QE shall be responsible for the cost of the interconnection facilities from the QF to the Point of Interconnection. 3.1.4 The QE shall provide interconnection facilities that adequately protect JPS’ distribution system, personnel and other persons from damage and injury, which may be caused by the QF. 3.1.5 The QE shall be responsible for its expenses, including overheads associated with owning, operating, maintaining, repairing, and replacing its interconnection equipment.
Appears in 3 contracts
Sources: Standard Offer Contract, Standard Offer Contract for the Purchase of as Available Energy, Standard Offer Contract for the Purchase of as Available Energy