Leadframe Enhancement Sample Clauses

Leadframe Enhancement. Key reliability issues affecting the interface between leadframe, the molding compound, and the die attach are: * Increase the interfacial adhesion to the molding compound and the die attach media. * Optimize or replace the polyamide tape on the leadframe to improve adhesion. * Develop and characterize a new leadframe alloy with higher strength for fine pitch stamping and in-process handling
Leadframe Enhancement. Fine pitch leadframes are currently manufactured by expensive etch technique. Stamping of higher lead count fine pitch leadframes will require looking at different materials. Key development tasks required are: * Developing a process for stress reduction in C7025 alloy prior and after stamping, * Evaluating high strength materials form punches, and * Designing and fabricating tooling for stamping two leadframes which are: **160-lead PQFP with a 6.0 mil internal pitch and 4.0 mil lead flat, and **304-lead PQFP with a 7.0 mil internal pitch and 4.0 mil lead flat or 240 lead PQFP.

Related to Leadframe Enhancement

  • System Enhancements State Street will provide to the Fund any enhancements to the System developed by State Street and made a part of the System; provided that State Street offer the Fund reasonable training on the enhancement. Charges for system enhancements shall be as provided in the Fee Schedule. State Street retains the right to charge for related systems or products that may be developed and separately made available for use other than through the System.

  • Maintenance Programme (i) The Contractor shall prepare a monthly maintenance programme (the “Maintenance Programme”) in consultation with the Authority’s Engineer and submit the same to the Authority’s Engineer not later than 10 (ten) days prior to the commencement of the month in which the Maintenance is to be carried out. For this purpose a joint monthly inspection by the Contractor and the Authority’s Engineer shall be undertaken. The Maintenance Programme shall contain the following: (a) The condition of the road in the format prescribed by the Authority’s Engineer; (b) the proposed maintenance Works; and (c) deployment of resources for maintenance Works.

  • Enhancements No Enhancement shall be provided in respect of any Series of Notes, nor will any Enhancement Provider have any rights hereunder, as third-party beneficiary or otherwise, unless the Servicer has provided its prior written consent to such Enhancement, such consent not to be unreasonably withheld.

  • Maintenance Program LESSEE's Maintenance Program

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity 1.1.02 Identify at least one individual to act as the program contact in the following areas: 1. Immunization Program Manager;