Light Maintenance Sample Clauses

Light Maintenance. The Contractor shall provide fully qualified maintenance worker(s) to complete restroom inspections and maintenance repairs on the night shift but may be done on the day or afternoon shifts at the sole discretion of the County’s Project Manager. Restrooms shall be fully clean and operational at the end of the maintenance worker(s)'s shift. The Contractor shall fully document daily, all maintenance and repair work accomplished, and all parts used. Personnel in this maintenance worker position are responsible for maintenance, replacement, and repairs shall include but not be limited to: day-to-day repairs including but not limited to changing light bulbs, removal of graffiti, repairs and adjustments to doors, locks, coat hangers, paper towel dispensers, napkin dispensers, toilet paper dispensers, partitions, sinks, toilet seats, soap dispensers, opening clogged drains, repairing traps and wash bowls, and other items as noted. The Contractor must notify the Department via the vendor’s electronic monitoring system and by creating a Work Order in EAMS (system used by the MDAD Work Order Center which is responsible for logging and distributing requests for maintenance services). The Contractor shall complete and document each facility and restroom inspection evaluation form at the end of each shift or duty period including before and after pictures. These reports shall be sent via email to the MDAD PM and always be available for review by the Department staff if requested.
Light Maintenance. The City shall provide lights during home Santa Fe Fuego baseball games.
Light Maintenance. All Building Standard fluorescent bulb replacement in the Premises and fluorescent and incandescent bulb replacement in the Common Areas of the Building.
Light Maintenance. The City acknowledges that the owner of the Texas Rangers Baseball Team has agreed with BRE (in the 2012 parking lease between such parties) to be responsible for maintenance and lamp replacement on the high mast light poles within the parking areas in the vicinity of the Ballpark. BRE hereby consents to the City’s making arrangements directly with the team owner to participate on a pro-rata basis with the team owner in the costs of the high mast light pole maintenance and re-▇▇▇▇▇▇▇ while the contractor, equipment, and personnel is on site to perform the maintenance and re-▇▇▇▇▇▇▇ for the two high mast light poles that are now on Parking Lot I.

Related to Light Maintenance

  • System Maintenance The Trust understands that USBFS will perform periodic maintenance to the System(s), which may cause temporary service interruptions. To the extent possible, USBFS shall notify the Trust of all planned outages and will perform any necessary maintenance during non-business hours.

  • Routine Maintenance (i) CRC shall be responsible for Routine Maintenance when necessary or desirable to maintain the Shared Assets in a safe operating condition, and to permit and facilitate (A) the performance by CRC of its obligations pursuant to this Agreement, and (B) the use of Shared Assets by the Operators in accordance with this Agreement. (ii) CSXT or NSR, directly or through their respective affiliates, may perform the work which CRC performed prior to the date of this Agreement when (A) CRC does not possess the skills needed for such work, (B) CRC lacks the necessary employees to do such work in a timely fashion, or (C) CRC does not possess the equipment needed to do such work. CRC and the party performing the work shall agree to a reasonable fee for such work prior to performance. CRC, CSXT and NSR may agree to have additional work performed either by CSXT, NSR or their affiliates.

  • Equipment Maintenance If this Contract involves computer or telecommunications hardware or other mechanical or electrical Equipment (use of the word "Equipment" means all the foregoing) as a Deliverable, then, during the warranty period and during any period covered by annual maintenance, the Contractor will provide Equipment maintenance to keep the Equipment in or restore the Equipment to good working order. This maintenance will include preventative and remedial maintenance, installation of safety changes, and installation of engineering changes based upon the specific needs of the individual item of Equipment. This maintenance will also include the repair, replacement, or exchange deemed necessary to keep the Equipment in good working order. For purposes of this Contract, Equipment restored to good working condition means Equipment that performs in accordance with the manufacturer's published specifications. The Contractor will exert its best efforts to perform all fault isolation and problem determination attributed to the Equipment covered under this Contract. The following services are outside the scope of this Contract: 1. Maintenance to bring the Equipment into compliance with any law, rule, or regulation if such law, rule, or regulation was not in effect on the acceptance date. 2. Repair and replacement work or increase in maintenance time as a result of damage or loss resulting from accident, casualty, neglect, misuse, or abuse if such is the State's fault (and beyond normal wear and tear), damage resulting from improper packing or failure to follow prescribed shipping instruction (If such is done by the State), failure of electrical power, air conditioning or humidity control, use of supplies not approved by the original manufacturer of the Equipment as describe or included in the Contractor's proposal, or causes other than ordinary use of Equipment. 3. Furnishing platens, supplies, or accessories, making specification changes, or adding, or removing approved accessories, attachments or other devices except as set forth herein. 4. Maintenance or increase in maintenance time resulting from any improper use, maintenance, or connection to other equipment (not done by the Contractor) that results in damage to the Equipment. 5. Activities required restoring the Equipment to good operating condition if the problem has resulted from someone other than Contractor's authorized service personnel repairing, modifying or performing any maintenance service on the Equipment.

  • General Maintenance Borrower shall maintain the Project Site and all improvements thereon, including lighting and signage, in good condition, free of debris, waste and graffiti, and in compliance with the applicable provisions of the Anaheim Municipal Code. Borrower shall maintain the improvements and landscaping on the Project Site in accordance with the Maintenance Standards (as hereinafter defined). Such Maintenance Standards shall apply to all buildings, signage, lighting, landscaping, irrigation of landscaping, architectural elements identifying the Project Site and any and all other improvements on the Project Site. To accomplish the maintenance, Borrower shall either staff or contract with and hire licensed and qualified personnel to perform the maintenance work, including the provision of labor, equipment, materials, support facilities, and any and all other items necessary to comply with the requirements of this Agreement. Borrower and its maintenance staff, contractors or subcontractors shall comply with the following standards (collectively, “Maintenance Standards”): (i) The Project Site shall be maintained in conformance and in compliance with reasonable maintenance standards for comparable first quality affordable housing projects, including but not limited to painting and cleaning of all exterior surfaces and other exterior facades comprising all private improvements and public improvements to the curbline. The Project Site shall be maintained in good condition and in accordance with the custom and practice generally applicable to comparable first quality affordable apartment complexes in the County of Orange (the “County”). (ii) Landscape maintenance shall include, but not be limited to: watering/irrigation; fertilization; mowing; edging; trimming of grass; tree and shrub pruning; trimming and shaping of trees and shrubs to maintain a healthy, natural appearance and safe road conditions and visibility, and irrigation coverage; replacement, as needed, of all plant materials; control of weeds in all planters, shrubs, lawns, ground covers, or other planted areas; and staking for support of trees. (iii) Clean-up maintenance shall include, but not be limited to: maintenance of all sidewalks, paths and other paved areas in clean and weed-free condition; maintenance of all such areas clear of dirt, mud, trash, debris or other matter which is unsafe or unsightly; removal of all trash, litter and other debris from improvements and landscaping prior to mowing; clearance and cleaning of all areas maintained prior to the end of the day on which the maintenance operations are performed to ensure that all cuttings, weeds, leaves and other debris are properly disposed of by maintenance workers. Governmental Lender agrees to notify Borrower in writing if the condition of the Project Site does not meet with the Maintenance Standards and to specify the deficiencies and the actions required to be taken by Borrower to cure the deficiencies. Upon notification of any maintenance deficiency, Borrower shall have commenced to cure such deficiency within thirty (30) days and shall diligently act to correct, remedy or cure such deficiency within no more than sixty (60) days. If the written notification states the problem is urgent relating to the public health and safety of the City of Anaheim or Governmental Lender, then Borrower shall have forty-eight (48) hours to rectify the problem. In the event Borrower does not maintain the Project Site in the manner set forth herein and in accordance with the Maintenance Standards, Governmental Lender shall have, in addition to any other rights and remedies hereunder, the right to maintain the Project Site, or to contract for the correction of such deficiencies, after written notice to Borrower, and Borrower shall be responsible for the payment of all such costs incurred by Governmental Lender.