LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceed, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 3 contracts
Sources: Construction Services Agreement, Construction Services Agreement, Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of NINE HUNDRED SIXTY-FOUR AND NO/100 DOLLARS ($964) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 2 contracts
Sources: Construction Services Agreement, Construction Contract
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE HUNDRED AND NO/100 DOLLARS ($100.00)per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work Work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO ONE HUNDRED AND NO/100 DOLLARS ($200.00)per 100.00) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Demolition Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceed, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- City-issued Notice to Proceed: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200.00) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, for individual projects, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceed, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- City-issued Notice to Proceed: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200.00) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE THOUSAND, SIX HUNDRED NINETY-NINE AND NO/100 DOLLARS ($1,699) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE HUNDRED AND NO/100 DOLLARS ($100.00) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work Work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, an additional sum of TWO ONE HUNDRED AND NO/100 DOLLARS ($200.00)per 100.00) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Demolition Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceed, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- City-issued Notice to Proceed: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor the amount set forth for Liquidated Damages shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per day for each calendar day of unexcused delay in achieving continue to be at the rate(s) specified above until final completion and readiness for final paymentis attained.
Appears in 1 contract
Sources: Annual Sidewalk Maintenance and Repair Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of EIGHT HUNDRED EIGHTY-TWO AND NO/100 DOLLARS ($882) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200.00) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of THREE THOUSAND, EIGHT HUNDRED NINETEEN AND NO/100 DOLLARS ($3,819) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of TWO THOUSAND, FIVE-HUNDRED NINETY-TWO AND NO/100 DOLLARS ($2,592) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE THOUSAND, SEVEN HUNDRED FORTY-TWO AND NO/100 DOLLARS ($1,742) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of ONE THOUSAND, SEVEN HUNDRED FORTY-TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 1,742) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment. In no event shall liquidated damages exceed FIVE PERCENT (5%) of the purchase price of the unit for which delivery has been delayed.
Appears in 1 contract
Sources: Agreement for Delivery, Installation, and Testing of Autotransformers
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor Vendor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor Vendor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor Vendor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE HUNDRED AND NO/100 DOLLARS ($100) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor Vendor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor Vendor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED TWENTY-FIVE AND NO/100 DOLLARS ($200.00)per 25) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor Vendor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor Vendor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor Vendor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE HUNDRED AND NO/100 DOLLARS ($100) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor Vendor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor Vendor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED TWENTY-FIVE AND NO/100 DOLLARS ($200.00)per 25)per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE HUNDRED AND NO/100 DOLLARS ($100) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED FIFTY AND NO/100 DOLLARS ($200.00)per 50) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Housing Rehabilitation Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of TWO HUNDRED AND NO/100 DOLLARS ($200) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED FIFTY AND NO/100 DOLLARS ($200.00)per 50) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE HUNDRED AND NO/100 DOLLARS ($100) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work Work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED FIFTY AND NO/100 DOLLARS ($200.00)per 50) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Demolition Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of XXXXXX AND NO/100 DOLLARS ($X,XXX) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of TWO HUNDRED FIFTY AND NO/100 DOLLARS ($250) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO ONE HUNDRED AND NO/100 DOLLARS ($200.00)per 100) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Agreement for Air Conditioning Computer Program System Upgrade and Air Handler Replacement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE HUNDRED AND NO/100 DOLLARS ($100.00) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work Work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO ONE HUNDRED AND NO/100 DOLLARS ($200.00)per 100.00) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Demolition Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates date specified on each City-issued Notice to Proceed, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost TWO HUNDRED AND NO/100 DOLLARS ($200.00) for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- City-issued Notice to Proceed: . After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO ONE HUNDRED AND NO/100 DOLLARS ($200.00)per 100.00) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Agreement for Miscellaneous Pavement Striping Services
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE THOUSAND, FORTY-FIVE AND NO/100 DOLLARS ($1,045) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of EIGHT HUNDRED EIGHTY-TWO AND NO/100 DOLLARS ($882) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE HUNDRED AND NO/100 DOLLARS ($100) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work Work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.FIFTY
Appears in 1 contract
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE HUNDRED AND NO/100 DOLLARS ($100) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work Work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, an additional sum of TWO HUNDRED FIFTY AND NO/100 DOLLARS ($200.00)per 50) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Demolition Agreement
LIQUIDATED DAMAGES FOR LATE COMPLETION. The parties agree that it would be extremely difficult and impracticable under the presently known facts and anticipated circumstances to ascertain and fix the actual damages that City and its residents would incur should Contractor fail to achieve Substantial Completion and/or Final Completion and readiness for final payment by the dates specified for each individual project under the terms of this Agreement. Accordingly, the parties agree that should Contractor fail to achieve Substantial Completion by the dates specified on each City-issued Notice to Proceeddate specified, then Contractor shall pay City, as liquidated damages and not as a penalty, the daily sum given in the schedule below based on individual project cost of ONE THOUSAND, ONE HUNDRED SEVENTY AND NO/100 DOLLARS ($1,170) per day for each calendar day of unexcused delay in achieving Substantial Completion beyond the date specified for Substantial Completion for each individual project in the City- issued Notice to Proceed: Contract Documents. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the time specified in the Contract Documents for Final Completion and readiness for final payment or any proper extension thereof granted by City, Contractor shall pay City, as liquidated damages and not as a penalty, additional sum of TWO HUNDRED AND NO/100 DOLLARS ($200.00)per 200) per day for each calendar day of unexcused delay in achieving completion and readiness for final payment.
Appears in 1 contract
Sources: Construction Services Agreement