Low Speed Large Format Copiers Clause Samples

Low Speed Large Format Copiers. Copiers with an engine speed for producing multiple images of 40 copies per minute or less (expressed as A4-sized copies per minute).

Related to Low Speed Large Format Copiers

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Framework Management Structure The Supplier shall provide a suitably qualified nominated contact (the “Supplier Framework Manager”) who will take overall responsibility for delivering the Goods and/or Services required within this Framework Agreement, as well as a suitably qualified deputy to act in their absence. The Supplier shall put in place a structure to manage the Framework in accordance with Framework Schedule 2 (Goods and/or Services and Key Performance Indicators). A full governance structure for the Framework will be agreed between the Parties during the Framework Agreement implementation stage. Following discussions between the Parties following the Framework Commencement Date, the Authority shall produce and issue to the Supplier a draft Supplier Action Plan. The Supplier shall not unreasonably withhold its agreement to the draft Supplier Action Plan. The Supplier Action Plan shall, unless the Authority otherwise Approves, be agreed between the Parties and come into effect within two weeks from receipt by the Supplier of the draft Supplier Action Plan. The Supplier Action Plan shall be maintained and updated on an ongoing basis by the Authority. Any changes to the Supplier Action Plan shall be notified by the Authority to the Supplier. The Supplier shall not unreasonably withhold its agreement to any changes to the Supplier Action Plan. Any such changes shall, unless the Authority otherwise Approves, be agreed between the Parties and come into effect within two weeks from receipt by the Supplier of the Authority’s notification. Regular performance review meetings will take place at the Authority’s premises throughout the Framework Period and thereafter until the Framework Expiry Date (“Supplier Review Meetings”). The exact timings and frequencies of such Supplier Review Meetings will be determined by the Authority following the conclusion of the Framework Agreement. It is anticipated that the frequency of the Supplier Review Meetings will be once every month or less. The Parties shall be flexible about the timings of these meetings. The purpose of the Supplier Review Meetings will be to review the Supplier’s performance under this Framework Agreement and, where applicable, the Supplier’s adherence to the Supplier Action Plan. The agenda for each Supplier Review Meeting shall be set by the Authority and communicated to the Supplier in advance of that meeting. The Supplier Review Meetings shall be attended, as a minimum, by the Authority Representative(s) and the Supplier Framework Manager.