Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.
Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (▇▇▇▇▇://▇▇▇▇▇.▇▇▇.▇▇▇▇▇.▇▇.▇▇/tpasscmblsearch/index.jsp) or by contacting
SCOPE OF ARCHITECT’S BASIC SERVICES 3.1 The Architect’s Basic Services consist of those described in this Article 3 and include usual and customary structural, mechanical, and electrical engineering services. Services not set forth in this Article 3 are Supplemental or Additional Services. § 3.1.1 The Architect shall manage the Architect’s services, research applicable design criteria, attend Project meetings, communicate with members of the Project team, and report progress to the Owner. § 3.1.2 The Architect shall coordinate its services with those services provided by the Owner and the Owner’s consultants. The Architect shall be entitled to rely on, and shall not be responsible for, the accuracy, completeness, and timeliness of, services and information furnished by the Owner and the Owner’s consultants. The Architect shall provide prompt written notice to the Owner if the Architect becomes aware of any error, omission, or inconsistency in such services or information. § 3.1.3 As soon as practicable after the date of this Agreement, the Architect shall submit for the Owner’s approval a schedule for the performance of the Architect’s services. The schedule initially shall include anticipated dates for the commencement of construction and for Substantial Completion of the Work as set forth in the Initial Information. The schedule shall include allowances for periods of time required for the Owner’s review, for the performance of the Owner’s consultants, and for approval of submissions by authorities having jurisdiction over the Project. Once approved by the Owner, time limits established by the schedule shall not, except for reasonable cause, be exceeded by the Architect or Owner. With the Owner’s approval, the Architect shall adjust the schedule, if necessary, as the Project proceeds until the commencement of construction. § 3.1.4 The Architect shall not be responsible for an Owner’s directive or substitution, or for the Owner’s acceptance of non-conforming Work, made or given without the Architect’s written approval. § 3.1.5 The Architect shall contact governmental authorities required to approve the Construction Documents and entities providing utility services to the Project. The Architect shall respond to applicable design requirements imposed by those authorities and entities. § 3.1.6 The Architect shall assist the Owner in connection with the Owner’s responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project.
Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)
Contract Database Metadata Elements Title: Sayville Union Free School District and Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU), Local 424 (2011) Employer Name: Sayville Union Free School District Union: Sayville Union Free School Custodial and Maintenance Employees Unit, United Public Service Employees Union (UPSEU) Local: 424 Effective Date: 07/01/2011 Expiration Date: 06/30/2015 PERB ID Number: 6131 Unit Size: 55 Number of Pages: 24 For additional research information and assistance, please visit the Research page of the Catherwood website - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/library/research/ For additional information on the ILR School - ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇▇▇.▇▇▇/ 55 People TABLE OF CONTENTS ARTICLE Page XXII ANNUAL LEAVE DAYS 14 XXV BREAKS 18 XXVI CIVIL SERVICE LAW ARTICLE SECTION 75 18 XXVIII DURATION 19 XIV EMERGENCY WORK 11 XXI FOUL WEATHER CLOTHING 14 XI GRIEVANCE PROCEDURE 9 XVI HIGHER JOB CLASSIFICATION 12 XVIII HOLIDAYS 13 XV HOLIDAY AND WEEKEND BUILDING CHECKS 12 V INSURANCE 4 X LAYOFF, DISPLACEMENT AND RECALL ORDER 8 VII MANAGEMENT RIGHTS 7 XXVII MISCELLANEOUS 19 XVII NOTICES OF PROMOTIONS 13 XIII OVERTIME 10 II PAYROLL DEDUCTIONS 1 III PERSONNEL FILES 2 XXIV PHYSICAL EXAMINATIONS 18 XXIII RETIREMENT 16 IX STRIKES AND LOCKOUTS 7 XIX VACATIONS 13 XX VISITATION 14 IV WAGES 3 VI WORKERS' COMPENSATION 6 XII WORKWEEK 10 VIII WRITTEN BOARD POLICY 8 APPENDIX A 20 4/20/2016 AGREEMENT made and entered into this day of November 2013 between the SAYVILLE UNION FREE SCHOOL DISTRICT (hereinafter referred to as the “District”) and United Public Service Employees Union, ▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇▇▇▇▇▇▇▇▇, N.Y. 11779 (hereinafter referred to as the “Union”).