MANUFACTURE, ASSEMBLY, AND TEST Sample Clauses

MANUFACTURE, ASSEMBLY, AND TEST. (Applicable to CLINs 0001-0008, 1001-1005, 2001-2005, 3001- 3005, 4001-4005). The Contractor shall build and deliver the Console, Display, and Peripheral Equipment in accordance with the relevant Technical Data Packages (TDPs) and specifications. The Contractor shall ensure that the Console, Display, and Peripheral Equipment built under this contract conforms to the specifications and associated documentation and drawings provided in the TDP in Attachment J-2. The Contractor shall procure, manufacture, and assemble materials required to produce the equipment and conduct component and manufactured item testing necessary to assure the quality of all manufactured and COTS items. The Contractor shall produce the following equipment variants as purchased: • Water Cooled CDS • Air Cooled CDS Consoles • Customer Specific Console Configurations (Air and Water Cooled) • Tactical Equivalent Consoles • Displays and Peripheral Equipment • Spare Parts to Support CDP Equipment

Related to MANUFACTURE, ASSEMBLY, AND TEST

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act. (B) All classes covered by this Agreement are designated special risk classes for drug testing purposes. Special risk means employees who are required as a condition of employment to be certified under Chapter 633 or Chapter 943, F.S. (C) An employee shall have the right to grieve any disciplinary action taken under section 112.0455, the Drug-Free Workplace Act, subject to the limitations on the grievability of disciplinary actions in Article 10. If an employee is not disciplined but is denied a demotion, reassignment, or promotion as a result of a positive confirmed drug test, the employee shall have the right to grieve such action in accordance with Article 6.

  • Inspection and Testing Each Constructing Entity shall cause inspection and testing of the Interconnection Facilities that it constructs in accordance with the provisions of this section. The Construction Parties acknowledge and agree that inspection and testing of facilities may be undertaken as facilities are completed and need not await completion of all of the facilities that a Constructing Entity is building.

  • Manufacturing (a) The Supplier shall without limitation be responsible, at no additional cost to the Purchaser, for: sourcing and procuring all raw materials for the Products; obtaining all necessary approvals, permits and licenses for the manufacturing of the Products; providing sufficient qualified staff and workers to perform the obligations under this Purchase Agreement; implementing and maintaining effective inventory and production control procedures with respect to the Products; and handling other matters as reasonably requested by the Purchaser from time to time. (b) The Supplier shall not change any process, material, component, packaging or manufacturing location without the Purchaser’s express prior written approval.

  • API If the Software offers integration capabilities via an API, your use of the API may be subject to additional costs or Sage specific policies and terms and conditions (which shall prevail in relation to your use of the API). You may not access or use the API in any way that could cause damage to us or the Software, or in contravention of any applicable laws. We reserve the right in our sole discretion, to: (i) update any API from time to time; (ii) place limitations around your use of any API; and (iii) deny you access to any API in the event of misuse by you or to otherwise protect our legitimate interests.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.