The Meter Hardware clause defines the responsibilities and terms related to the physical devices used to measure utility consumption, such as electricity, water, or gas meters. It typically specifies which party is responsible for providing, installing, maintaining, and replacing the meter hardware, and may address issues like ownership, access for inspection, and standards for accuracy. By clearly outlining these obligations, the clause helps prevent disputes over meter functionality and ensures accurate measurement and billing for utility usage.
Meter Hardware. 4.1. A push button for reading the display manually must be provided. As mentioned in Item (3.13). 4.2. The meter shall have the facility to be read even if the power is not present. 4.3. The Non-volatile memory minimum retention time shall not be less than 20 Years which has to be confirmed by an official certificate. And the memory shall be replaceable and compatible with a slot (adapter) provided by supplier, so that the memory can be read externally in case of meter failure or damaging. 4.4. The battery shall be changeable easily (inside sealed cover) and the lifetime shall not be less than 15 years which has to be approved. And the meter shall continue to operate even if the battery is lost for any reasons. The battery should not be used if the meter is connected to power. 4.5. The lifetime of the offered meter has to be not less than (20 years) which has to be confirmed by an official certificate. 4.6. The lifetime of the offered LCD has to be not less than (20 years) which has to be confirmed by official certificate. 4.7. During the meter lifetime it doesn’t require any calibration or maintenance, stability of meter accuracy should be guaranteed. The lifetime of the meter has to be confirmed by an official organization. A certificate to this effect has to be provided. 4.8. The meter shall be equipped with four LED’s: 4.8.1. Active Energy Impulse LED for meter testing, and the meter constant shall be in from of impulse/ KWh. And this LED should have not less than 2 cm from any other LED. 4.8.2. Reactive Energy Impulse LED for meter testing, and the meter constant shall be in from of impulse/ KVARh. And this LED should have not less than 2 cm from any other LED. 4.8.3. Alarm LED: the description is in point 7.0. 4.8.4. Power and Relay LED: the description is in point 10.0. 4.9. The meters shall not generate waves or harmonics which might affect the neighboring electrical instruments or super imposed on power lines and shall not be affected by power failure that may prevent control of the meters. 4.10. The meter shall have a case which provides an ingress protection rating of IP54 in accordance with IEC 60529:1989 with extended terminal cover having rigid and homogeneous thickness without knock out grooves (weak areas) to prevent access to the feeding wires. 4.11. The enclosures of meters should be capable of being easily sealed with lead and two steel wire seals (the seals will supplied and installed by IDECO as per our ▇▇▇▇▇▇▇ with 1mm diameter for e...
Meter Hardware. 3.1. A push button for reading the display manually must be provided. And this list of registers shall be separate from the auto cycle mentioned in Item (2.15). 3.2. The meter shall have the facility to be read even if the power is not present. 3.3. The battery shall be changeable easily (inside sealed cover) and the lifetime shall not be less than 15 years which has to be approved. And the meter shall continue to operate even if the battery is lost for any reasons. The battery should not be used if the meter is connected to power. 3.4. The lifetime of the offered meter has to be not less than (20 years) which has to be confirmed by an official certificate.
Meter Hardware. 4.1. A push button for reading the display manually must be provided. And this list of registers shall be separate from the auto cycle mentioned in Item (3.13). 4.2. The meter shall have the facility to be read even if the power is not present. 4.3. The Non-volatile memory minimum retention time shall not be less than 20 Years which has to be confirmed by an official certificate. And the memory shall be replaceable and compatible with a slot (adapter) provided by supplier, so that the memory can be read externally in case of meter failure or damaging. 4.4. The battery shall be changeable easily (inside sealed cover) and the lifetime shall not be less than 15 years which has to be approved. And the meter shall continue to operate even if the battery is lost for any reasons. The battery should not be used if the meter is connected to power. 4.5. The lifetime of the offered meter has to be not less than (20 years) which has to be confirmed by an official certificate. 4.6. The lifetime of the offered LCD has to be not less than (20 years) which has to be confirmed by official certificate. 4.7. During the meter lifetime it doesn’t require any calibration or maintenance, stability of meter accuracy should be guaranteed. The lifetime of the meter has to be confirmed by an official organization. A certificate to this effect has to be provided. 4.8. The meter shall be equipped with four LED’s: 4.8.1. Active Energy Impulse LED for meter testing, and the meter constant shall be in from of impulse/ KWh. And this LED should have not less than 2 cm from any other LED. 4.8.2. Reactive Energy Impulse LED for meter testing, and the meter constant shall be in from of impulse/ KVARh. And this LED should have not less than 2 cm from any other LED. 4.8.3. Alarm LED: the description is in point 7.0. 4.8.4. Power LED 4.9. The meters shall not generate waves or harmonics which might affect the neighboring electrical instruments or super imposed on power lines and shall not be affected by power failure that may prevent control of the meters. 4.10. The meter shall have a case which provides an ingress protection rating of IP54 in accordance with IEC 60529:1989 with extended terminal cover having rigid and homogeneous thickness without knock out grooves (weak areas) to prevent access to the feeding wires. 4.11. The enclosures of meters should be capable of being easily sealed with lead and two steel wire seals (the seals will supplied and installed by IDECO as per our ▇▇▇▇▇▇▇ with 1...
Meter Hardware. Item Approved Deviation 4.1 4.2 4.3 4.4
Meter Hardware. Item Priority weight Notes and clarification 4.1 1 4.2 1 4.3 2 Factory Guarantee could be accepted 4.4 2 Factory Guarantee could be accepted 4.5
Meter Hardware. 3.1. A push button for reading the display manually must be provided. And this list of registers shall be separate from the auto cycle display. 3.2. The meter registers shall have the facility to be read even if the power is not present. 3.3. The battery shall be changeable easily (inside sealed cover) and the lifetime shall not be less than 15 years which has to be approved and the meter shall continue to operate even if the battery is lost for any reasons. The battery should not be used if the meter is connected to power. 3.4. The lifetime of the offered meter has to be not less than (15 years) which has to be confirmed by an official certificate. 3.5. During the meter lifetime it doesn’t require any calibration or maintenance, stability of meter accuracy should be guaranteed. The lifetime of the meter has to be confirmed by an official organization. A certificate to this effect has to be provided. 3.6. The meter shall have a case which provides an ingress protection rating of IP51 in accordance with IEC 60529:1989 with extended terminal cover having rigid and homogeneous thickness without knock out grooves (weak areas) to prevent access to the feeding wires. 3.7. Materials of the main cover of the meter shall be non-transparent color and the terminal cover shall be transparent both cover must be high resistive to fire hazards. It should be of sufficient strength to protect the working parts and to be adequate to protect the meter against mechanical injury. It shall not be affected by chemical materials used for cleaning purposes specially the meter's LCD. The quality of materials should be fully complying with the all tests according to IEC. 3.8. The meter should be of the front-connected type with a hanging device provided and fitted on the base compatible with test rack fixings. 3.9. The equipment in this specification should be capable of accepting any size of conductor in the range
Meter Hardware. A push button for reading the display manually must be provided. And this list of registers shall be separate from the auto cycle mentioned in Item (2.15).

Related to Meter Hardware

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: ▇▇▇▇▇://▇▇▇▇▇▇▇.▇▇▇▇▇▇▇▇.▇▇▇/guides/signer-guide- signing-system-requirements.

  • Electrical Items All electrical items purchased under this Grant Agreement/Contract or used in the performance of approved and eligible grant-funded activities must meet all applicable Occupational Safety and Health Administration (OSHA) standards and regulations, and bear the appropriate listing from Underwriters Laboratory (UL), Factory Mutual Resource Corporation (FMRC), or National Electrical Manufacturers Association (NEMA).

  • Customer Equipment “Customer Equipment” means any Customer-owned or provided software, hardware or services that you elect to use in connection with the Service(s). You agree to allow us and our agents the rights to insert CableCARDs and other hardware in the Customer Equipment, send software and/or downloads to the Customer Equipment and install, configure, maintain, inspect and upgrade the Customer Equipment. You warrant you are either the owner of the Customer Equipment or that you have the authority to give us access to the Customer Equipment. You should call Customer Service at ▇-▇▇▇-▇▇▇-▇▇▇▇ to find out if it meets our technical, security and other requirements. We reserve the right to disallow the use of Customer Equipment that we determine is not compatible with our network. We shall have no obligation to provide, maintain, or service Customer Equipment, including, but not limited to, Customer Equipment to which the Company or a third party has sent software or downloads. If you use Customer Equipment, you agree that the following limitation of liability shall apply: THE COMPANY DOES NOT WARRANT THAT CUSTOMER EQUIPMENT WILL ENABLE YOU TO SUCCESSFULLY INSTALL, ACCESS, OPERATE, OR USE THE SERVICE(S). YOU ACKNOWLEDGE THAT ANY SUCH INSTALLATION, ACCESS, OPERATION, OR USE COULD CAUSE CUSTOMER EQUIPMENT TO FAIL TO OPERATE OR COULD CAUSE DAMAGE TO CUSTOMER EQUIPMENT, YOU, YOUR PREMISES OR COMPANY EQUIPMENT. NEITHER THE COMPANY NOR ANY OF ITS AFFILIATES, SUPPLIERS OR AGENTS SHALL HAVE ANY LIABILITY WHATSOEVER FOR ANY SUCH FAILURE OR DAMAGE, INCLUDING LACK OF 911/E911 CAPABILITY OR DIALING ASSOCIATED WITH A SECURITY SYSTEM. YOUR USE OF CUSTOMER EQUIPMENT MAY PREVENT PROVISION OF SERVICE. The foregoing limitation of liability is in addition to and shall not limit any other limitation of liability set forth in this Agreement.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.