Minimum Streamflows From Project Reservoirs Not Diverted into El Dorado Canal Sample Clauses

Minimum Streamflows From Project Reservoirs Not Diverted into El Dorado Canal. The licensee shall not divert into the El Dorado Canal applicable minimum streamflow 13 releases as specified in the tables in Appendix A, Section 1, of the Settlement for the months listed below from Lake Aloha Dam, ▇▇▇▇▇▇ Lake Dam, and Silver Lake Dam. These streamflows shall be combined with the minimum streamflows required at Kyburz 15 Diversion Dam. The months in which this requirement would apply are listed in the table below. The licensee shall not divert these streamflows provided the FS, in consultation 16 with the ERC and SWRCB, makes an affirmative determination, based on the first 5 years of monitoring results, that applicable ecological resource objectives are not being 17 met with the initial flow regime described in Appendix A, Section 1, of the Settlement. Wet September, October AN September, October BN August, September, October Dry July, August, September, October CD August, September, October, November 20 22 233. ▇▇▇▇▇▇ Dam Spillway Maximum Flows 24 The FS may adjust the ▇▇▇▇▇▇ Dam Spillway channel maximum flow of 60 cfs if results 25 of the geomorphology monitoring elements described in the El Dorado Hydroelectric Project Monitoring Plan indicate that these flows are resulting in damage to the ▇▇▇▇▇▇ 26 Creek Spillway Channel or it is determined, after channel stabilization and monitoring, that the channel can withstand higher flows without experiencing detrimental effects. The FS shall make the final determination as to whether the allowable spill flow shall be 1 adjusted.

Related to Minimum Streamflows From Project Reservoirs Not Diverted into El Dorado Canal

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.

  • PREVAILING WAGE RATES - PUBLIC WORKS AND BUILDING SERVICES CONTRACTS If any portion of work being Bid is subject to the prevailing wage rate provisions of the Labor Law, the following shall apply:

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations.

  • Completion of Concrete Pours and Emergency Work (a) Except as provided in this sub-clause an Employee shall nor work or be required to work in the rain. (b) Employees shall not be required to start a concrete pour in Inclement Weather. (c) Where a concrete pour has been commenced prior to the commencement of a period of Inclement Weather Employees may be required to complete such concrete pour to a practical stage and for such work shall be paid at the rate of double time calculated to the next hour, and in the case of wet weather shall be provided with adequate wet weather gear. (d) If an Employee’s clothes become wet as a result of working in the rain during a concrete pour the Employee shall, unless the Employee has a change of dry working clothes available, be allowed to go home without loss of pay. (e) The provisions of clauses 32.7(c) and 32.7(d) hereof shall also apply in the case of emergency work where the Employees concerned and their delegates agree that the work is of an emergency nature and can start and/or proceed.

  • Procurement Project not financed with EU Funds The procurement is covered by the Government Procurement Agreement (GPA): yes