Monitoring Results Clause Samples

The Monitoring Results clause establishes the requirement for one party to track, record, and report on specific outcomes or performance metrics related to the agreement. Typically, this involves collecting data on progress, compliance, or quality, and providing regular updates or reports to the other party. By formalizing these obligations, the clause ensures transparency and accountability, enabling both parties to assess whether contractual objectives are being met and to address issues proactively if targets are not achieved.
Monitoring Results. 3.7.1 The monitoring results for construction noise are summarized in Table 3.4 and the monitoring data is provided in Appendix I. Table 3.4 Summary of Construction Noise Monitoring Results in the Reporting Period Average, dB(A), Leq (30 mins) Range, dB(A), Leq (30 mins) Limit Level, dB(A), Leq (30 mins) NMS2 66 67 – 68* 75 NMS3B 63 61 – 65* 70/65^ *+3dB(A) Façade correction included ^ Daytime noise Limit Level of 70 dB(A) applies to education institutions, while 65dB(A) applies during school examination period. 3.7.2 No Action or Limit Level Exceedance of construction noise was recorded in the reporting month. 3.7.3 Major noise sources during the noise monitoring included construction activities of the Project, construction activities by other contracts and nearby traffic noise. 3.7.4 The event action plan is annexed in Appendix L.
Monitoring Results. 4.1. Both parties must constantly analyse the results of the services rendered by the Supplier under this agreement in order to gauge the effectiveness thereof in relation to the proposed targets.
Monitoring Results. 2.3.1. The monitoring results for AMS6 and AMS7B are reported in the monthly EM&A Reports prepared for Contract Nos. HY/2011/03 and HY/2013/01 respectively.
Monitoring Results. 3.3.1 The monitoring results for NMS2 and NMS3B are reported in the monthly EM&A Reports prepared for Contract No. HY/2013/01. There was no exceedance for noise recorded at station NMS2 and station NMS3B by the Environmental Team of Contract No. HY/2013/01 during the reporting period.
Monitoring Results the results of any monitoring conducted by Te Māngai Pāho under clause 8 showing that the Broadcaster has maintained the required level of Te Reo Māori broadcasting; and
Monitoring Results. Monitoring methodology; ▪ Types of equipment used and calibration dates; ▪ Parameters monitored; ▪ Monitoring locations; ▪ Monitoring date, time, and duration; ▪ Weather conditions; ▪ Any factors which might affect the monitoring results; ▪ Graphical plots of monitored parameters.
Monitoring Results. 3.7.1 The monitoring results for construction noise are summarized in Table 3.4 and the monitoring data is provided in Appendix I. Table 3.4 Summary of Construction Noise Monitoring Results in the Reporting Period Average, dB(A), Leq (30 mins) Range, dB(A), Leq (30 mins) Limit Level, dB(A), Leq (30 mins) NMS2 66 65 –67* 75 NMS3A 64 62 – 66 70^ *+3dB(A) Façade correction included ^ Daytime noise Limit Level of 70 dB(A) applies to education institutions 3.7.2 No noise Action Level and Limit Level exceedance was recorded at all monitoring stations in the reporting month. 3.7.3 Major noise sources during the noise monitoring included construction activities of the Project, construction activities by other contracts and nearby traffic noise. 3.7.4 The event action plan is annexed in Appendix L.
Monitoring Results. To provide monitoring results (in both hard and diskette copies) together with the following information: • Monitoring methodology • Name of laboratory and types of equipment used and calibration details • Parameters monitored • Monitoring locations (and depth); • Monitoring date, time, frequency, and duration; • Weather conditions during the period; and • Any other factors which might affect the monitoring results; • QA/QC results and detection limits
Monitoring Results. Analytical results from Syar’s storm water sampling and analysis during the term of this AGREEMENT shall be provided to CSPA within 14 days of receipt of the analytical results by Syar or its counsel.
Monitoring Results. Description of the overall environmental impact of RCPP to the immediate and surrounding project area.