Model Output Clause Samples

POPULAR SAMPLE Copied 1 times
Model Output. “Model Output” means the output and data that is derived from running a Model.
Model Output. “Model Output” means any data or information obtained through running or performing any experiments with the Model including but not limited to model outputs, charts, plots, statistics, logs, reports, animations, pictures.
Model Output. The main detail of what is happening is shown in the text displayed with the output window to the right. What is shown here depends on the debugging options above this. If debug? is true then the calling of every high-level procedure is shown along with values it is called with. If trace? is true then only the actions of agents are logged. Setting aft-go? to true means both of these only have effect after setup is finished. If any string is entered into the filter-string box then only those lines which include this string are shown, allowing logs that only record what happens to one agent etc. If the pause? option is enabled then the code will pause every time it reaches a “_p” statement in the code, to facilitate step-by-step debugging.

Related to Model Output

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • Fuel The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 per litre (which includes a service component).

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the ISO OATT.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.