Necessity test Clause Samples

Necessity test. Under the necessity test, sometimes referred to as the 'indispensability' test, a dominant firm must use the least anti-­‐competitive means to reach its professed goal. Various authors, such as ▇▇▇▇▇▇▇▇▇▇ and ▇▇▇▇▇▇▇▇▇▇▇▇▇, appear to attach much weight to the necessity test.564 The value of the necessity test for 563 Even though such conduct may have wider benefits. 564 ▇▇▇▇▇▇▇▇▇▇ 2005, supra note 332, at 466. See also ▇▇▇▇▇▇▇▇▇▇▇▇▇ 2005, supra note 339, at 172-­‐173. objective justification is not apparent from early case law such as United Brands. The ECJ held that, in principle, the dominant firm is at liberty to decide what type of action it carries out as part of a commercial ‘counter-­‐attack’ vis-­‐à-­‐vis its competitors.565 The judgment does not include a requirement to choose the least anti-­‐competitive means. In addition, the ECJ seemed to create a link between the principle of proportionality and ‘the economic strength of the undertakings confronting each other’.566 This does not seem to refer to a necessity test, but rather a requirement to abstain from certain conduct depending on the degree of dominance. Such a test is compatible with a concept of dominance that is not black and white but more akin to a sliding scale (as suggested in section 2.2). However, the case law seems to have made a gradual shift with an increased focus on the necessity test.567 Tetra Pak II can be interpreted as an early indication that a necessity test should be performed. In that case, the General Court was unconvinced that the protection of public health – the professed goal of the prima facie abuse – could not be guaranteed by other means.568 Later, in British Airways, the ECJ established the necessity criterion more firmly: ‘If the exclusionary effect of [a rebate] system […] goes beyond what is necessary in order to attain [efficiency] advantages, that system must be regarded as an abuse.’569 The same emphasis on the necessity test is apparent from the Commission decision in Microsoft.570 For its part, the ECJ firmly established the necessity test as one of the legal conditions in Post Danmark.571 A way to reconcile British Airways, Microsoft and Post Danmark on the one hand; and United Brands on the other hand is by considering the different types of objective justification that were at play. In the former cases, the dominant firm invoked an efficiency plea. In such a balancing exercise it is 565 United Brands, supra note 417, para 189. 566 Ibid., para 190. 5...

Related to Necessity test

  • Stability Testing Patheon will conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within [***], after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications and cGMPs. Patheon will give Client all stability test data and results at Client’s request.

  • Performance Testing (a) All performance tests of the Project, including any Initial Performance Test required in Section 2 of Appendix VIII, will be performed in accordance with the test procedures set forth in Appendix VIII (“Performance Test”), including additional procedures and protocols related to Performance Testing as mutually agreed between Buyer and Seller (“Test Procedures”). Seller shall bear all costs and receive all revenues, if applicable, associated with all Performance Tests. (b) After the Initial Delivery Date and during the Delivery Term, Buyer will have the right to conduct a Performance Test (“Buyer Performance Test”) no more than once a calendar year to demonstrate whether the Project is capable of delivering the Distribution Services at the Contract Capacity. Within 30 calendar days following a Buyer Performance Test, Seller will have the right to retest the Project with a Performance Test (“Seller Retest”). For the avoidance of doubt, the results of any Seller Retest will supersede the results of the preceding Buyer Performance Test. (i) If a Buyer Performance Test or, if a corresponding Seller Retest has occurred, a Seller Retest demonstrates the Project is capable of delivering Distribution Services at or above ninety-nine percent (99%) of the Initial Contract Capacity, the Contract Capacity will remain the Initial Contract Capacity; (ii) If a Buyer Performance Test or, if a corresponding Seller Retest has occurred, a Seller Retest demonstrates the Project is capable of delivering Distribution Services at more than or equal to eighty-five (85%) of the Initial Contract Capacity, but less than ninety-nine percent (99%) of the Initial Contract Capacity (“Testing Band”), the Contract Capacity will be automatically adjusted (upwards or downwards) to the capacity commensurate with the amount of Distribution Services the Project delivered during the Performance Test within the Testing Band. (iii) If a Buyer Performance Test or, if a corresponding Seller Retest has occurred, a Seller Retest demonstrates the Project is not capable of delivering Distribution Services of at least eighty-five percent (85%) of the Initial Contract Capacity, an Event of Default shall occur in accordance with Section 7.1(a)(viii).

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.