Objectives of the Assignment. 3.1 The objectives of the Assignment are as follows: (a) given that domestic food waste to be collected primarily from domestic generators in the Sha Tin and nearby districts would be delivered by Refuse Collection Vehicles to the Site by others, evaluate the quantity, quality and characteristics of domestic food waste that could be made available for the Trial Scheme; (b) assess and recommend appropriate pre-treatment methods and equipment for domestic food waste including reception facilities for domestic food waste to be delivered to the Site; (c) carry out a reference design of the Project and establish the engineering feasibility; (d) identify and assess the interfacing issues between the food waste pre-treatment facilities and the existing anaerobic digestion facilities and other existing process/facilities of the Sha Tin STW that may be affected, and propose cost-effective solutions to resolve the interfacing problems; (e) conduct an environmental review to ensure that most of the significant environmental factors of the Project are addressed and proper environmental mitigation measures as necessary are proposed, including implications on the requirements of the current Environmental Permit of the Sha Tin STW; (f) review the current land use in Sha Tin STW and apply for planning permission, if necessary; (g) conduct a traffic impact assessment associated with the food waste collection and delivery at selected road junctions within the area of influence of the Sha Tin STW, and assess movements of vehicles associated with the delivery/unloading of food waste entering/ leaving and within the Sha Tin STW and recommend traffic arrangements to minimize potential impact on the operation of the Sha Tin STW ; (h) resolve any land use issues; (i) support and conduct public consultations; (j) carry out the procurement and tendering process for the Project; (k) undertake contract administration, project management, site supervision and post-commissioning monitoring for the Project to ensure proper execution by the Contractor of the design, construction, testing and commissioning in accordance with the Contract; (l) monitor, review, provide expert advice and report on matters relating to the design, construction, testing and commissioning, environmental, operational and safety requirements of the Contract to achieve: i. satisfactory and successful progress and completion of the design and construction within the Contract programme and Capital Value; ii. the required quality and performance standards for the design, construction, operation and maintenance; and iii. compliance with the environmental, operational and safety requirements. (m) conduct operational, maintenance, environmental and safety post-commissioning performance monitoring and reviews for a period of six months upon the Project’s commissioning.
Appears in 1 contract
Sources: Consultancy Agreement
Objectives of the Assignment. 3.1 The objectives of the Assignment are as follows:
(a) : given that domestic food waste to be collected primarily from domestic generators in the Sha Tin and nearby districts would be delivered by Refuse Collection Vehicles to the Site by others, evaluate the quantity, quality and characteristics of domestic food waste that could be made available for the Trial Scheme;
(b) ; assess and recommend appropriate pre-treatment methods and equipment for domestic food waste including reception facilities for domestic food waste to be delivered to the Site;
(c) ; carry out a reference design of the Project and establish the engineering feasibility;
(d) ; identify and assess the interfacing issues between the food waste pre-treatment facilities and the existing anaerobic digestion facilities and other existing process/facilities of the Sha Tin STW that may be affected, and propose cost-effective solutions to resolve the interfacing problems;
(e) ; conduct an environmental review to ensure that most of the significant environmental factors of the Project are addressed and proper environmental mitigation measures as necessary are proposed, including implications on the requirements of the current Environmental Permit of the Sha Tin STW;
(f) ; review the current land use in Sha Tin STW and apply for planning permission, if necessary;
(g) ; conduct a traffic impact assessment associated with the food waste collection and delivery at selected road junctions within the area of influence of the Sha Tin STW, and assess movements of vehicles associated with the delivery/unloading of food waste entering/ leaving and within the Sha Tin STW and recommend traffic arrangements to minimize potential impact on the operation of the Sha Tin STW ;
(h) ; resolve any land use issues;
(i) ; support and conduct public consultations;
(j) ; carry out the procurement and tendering process for the Project;
(k) ; undertake contract administration, project management, site supervision and post-commissioning monitoring for the Project to ensure proper execution by the Contractor of the design, construction, testing and commissioning in accordance with the Contract;
(l) ; monitor, review, provide expert advice and report on matters relating to the design, construction, testing and commissioning, environmental, operational and safety requirements of the Contract to achieve:
i. : satisfactory and successful progress and completion of the design and construction within the Contract programme and Capital Value;
ii. ; the required quality and performance standards for the design, construction, operation and maintenance; and
iii. and compliance with the environmental, operational and safety requirements.
(m) . conduct operational, maintenance, environmental and safety post-commissioning performance monitoring and reviews for a period of six months upon the Project’s commissioning.