ORDERING - CAGED PHYSICAL COLLOCATION Sample Clauses

ORDERING - CAGED PHYSICAL COLLOCATION. 40.34.1 Upon receipt of a Collocation Order Form and QPF, USW will perform a feasibility study to determine if adequate space can be found for the placement of ATTI's equipment within the Wire Center. The feasibility study will be provided within ten (10) calendar days from date of receipt of the QPF. If Collocation entrance facilities and office space are found to be available, USW will develop a quote for the supporting structure within twenty-five (25) calendar days of providing the feasibility study. Caged Physical Collocation price quotes will be honored for thirty (30) calendar days from the date the quote is provided. Upon receipt of the signed quote, 50% down and proof of insurance, space will be reserved and construction of the Collocation space by USW will begin. The cage will be available to ATTI for placement of its equipment within ninety (90) calendar days of receipt of the 50% down payment. Depending on specific Wire Center conditions, shorter intervals may be available. USW agrees to notify ATTI as soon as USW is aware that completion of the collocation space will occur prior to the normal 90 day interval. Final payment is due upon completion of work and acceptance by ATTI. Recurring monthly charges for the Collocation commence upon the completion of the Collocation and acceptance by ATTI. 40.34.2 Due to variables in equipment availability and scope of the work to be performed, additional time in special circumstances may be required for implementation of the structure required to support the Collocation request. Examples of structure that may not be completed within ninety (90) calendar days may include additional time for placement of a POI, DC power upgrades and space reclamation required to meet ATTI's Collocation request. Such variables when identified by U S WEST will be disclosed to ATTI as soon as possible. 44 Part A

Related to ORDERING - CAGED PHYSICAL COLLOCATION

  • Physical Collocation (a) If space for Physical Collocation is immediately available at the time of Requesting Carrier’s Collo Order, Ameritech shall include in its Collo Response to Requesting Carrier notice of such immediate availability. (b) If Requesting Carrier’s requested Physical Collocation space is available, Ameritech and Requesting Carrier shall have an initial walk-through of such space within the interval specified in the Implementation Plan. Absent Ameritech’s written consent, Requesting Carrier must have at least one (1) authorized employee (i.e., in addition to any authorized vendor) at such walk- through. If during the initial walk-through, Requesting Carrier wishes to modify or change its Collo Request, Requesting Carrier must sign or initial any such modifications or changes and provide Ameritech a change order reflecting same within five (5) Business Days of such initial walk-through. If a change or modification is noted at the initial walk-through, Ameritech shall have no obligation to commence work on Requesting Carrier’s Collocation space until it receives a change order to amend the Collo Request or written confirmation that Requesting Carrier does not wish to pursue such change or modification. Failure to provide Ameritech the change order or written confirmation within the foregoing five (5) Business Day period shall be deemed a Requesting Carrier Delaying Event for the period between the expiration of such five (5) day period and the date of actual receipt by Ameritech. (c) Ameritech shall deliver to Requesting Carrier the requested space on or before the later of (i) one hundred twenty (120) days from Ameritech’s receipt of Requesting Carrier’s Collo Order, (ii) ninety (90) days from the date of the initial walk-through and (iii) such other reasonable date that the Parties may agree upon if it is not feasible for Ameritech to deliver to Requesting Carrier such space within the foregoing intervals (such date of delivery referred to as the “Delivery Date”). (d) Physical Collocation space ordered by Requesting Carrier will be made available to Requesting Carrier by Ameritech as more fully described in Section 1 of Schedule 12.12. (e) Ameritech may begin billing recurring charges for the Collocated space on the date such space is made available for occupancy (the “Occupancy Date”). Requesting Carrier shall vacate the Collocated space if either (i) Requesting Carrier (or one of its Resident Collocators, if applicable) fails to install within ninety (90) days of the Occupancy Date the equipment necessary for Interconnection with Ameritech and/or access to Ameritech’s unbundled Network Elements to be housed in such space or (ii) Requesting Carrier (or one of its Resident Collocators, if applicable) fails to Interconnect to the Ameritech network within one hundred fifty (150) days of the Occupancy Date. If Requesting Carrier is required to vacate the space pursuant to this Section 12.12.2(e), Requesting Carrier (and its Resident Collocators) shall vacate such space within ninety (90) Business Days of the earliest to occur of the foregoing events. If, after vacating a space, Requesting Carrier still requires Collocation in that Premises, Requesting Carrier shall be required to submit a new request for Collocation pursuant to the provisions of Section 12.12.1. (f) Physical Collocation will be subject to the additional rules and regulations set forth in Section 2.0 of Schedule 12.12. (g) At Requesting Carrier’s request Ameritech shall provide for APCS within three

  • Annual Collateral Verification Each year, at the time of delivery of annual financial statements with respect to the preceding Fiscal Year pursuant to Section 5.1(c), Company shall deliver to Collateral Agent a certificate of an Authorized Officer either (i) confirming that there has been no change in such information since the date of the Collateral Questionnaire delivered on the Closing Date or the date of the most recent certificate delivered pursuant to this Section 5.1(o) or (ii) identifying such changes;

  • Securing Physical Facilities DST shall maintain systems located in DST facilities that host Fund Data or provide services under the Agreement in an environment that is designed to be physically secure and to allow access only to authorized individuals. A secure environment includes the availability of onsite security personnel on a 24 x 7 basis or equivalent means of monitoring locations supporting the delivery of services under the Agreement.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Freedom has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Freedom. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Freedom (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Freedom, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Freedom will then have the option of paying the one-time SC rates to place the Loop.

  • Equipment Location The Company recognizes that it is important when designing, constructing, and maintaining physical plant components, to have regard for the specific placement of equipment, with a view to the elimination of hazardous work situations. Accordingly, wherever practical to do so, new installations, or the rebuild of existing installations, will be designed accordingly.