Overriding Considerations Justifying Project Approval Sample Clauses

Overriding Considerations Justifying Project Approval. In accordance with CEQA Guidelines Section 15093, the Board has, in determining whether or not to approve the Project, balanced the economic, social, technological, and other project benefits against the Project's unavoidable environmental risks, and finds that the benefits of the Project set forth below outweigh the significant adverse environmental effects that are not mitigated to less than significant levels. This statement of overriding considerations is based on the Board’s review of the Final EIR and other information in the administrative record. The benefits identified below provide separate and independent bases for overriding the significant environmental effects of the Project. • The Project would replace 3,500 AFY of unauthorized Carmel River diversions for municipal use with additional groundwater pumping enabled by recharge of purified recycled water; • The Project would provide up to 4,500 – 4,750 AFY and up to 5,900 AFY in drought years of additional recycled water to ▇▇▇▇▇▇▇ Valley growers for crop irrigation; • The ▇▇▇▇▇▇▇ Valley Groundwater Basin is in overdraft and the Project would reduce the volume of water pumped from ▇▇▇▇▇▇▇ Valley aquifers; • The Project would increase water supply reliability and drought resistance; • The Project would maximize the use of recycled water in compliance with the state Recycled Water Policy; • The Project would reduce pollutant loads from agricultural areas to sensitive environmental areas including the ▇▇▇▇▇▇▇ River and Monterey Bay.

Related to Overriding Considerations Justifying Project Approval

  • Project Approval The County may issue a Job Order Authorization for the Work, to include the firm-fixed-price of the Job Order and the project duration. Contractor agrees that all clauses of this Contract are applicable to any Job Order issued hereunder. The County reserves the right to reject a Contractor’s Quote based on unjustifiable quantities and/or methods, performance periods, inadequate documentation, or other inconsistencies or deficiencies on the Contractor’s part in the sole opinion of the County. The County reserves the right to issue a unilateral Job Order authorization for the Work if a Quote price cannot be mutually agreed upon. This is based upon unjustifiable quantities in the sole opinion of the County. The County also reserves the right to not issue a Job Order Authorization if the County’s requirement is no longer valid or the project is not funded. In these instances, the Contractor has no right of claim to recover Quote expenses. The County may pursue continuing valid requirements by other means where Contract was not reached with the Contractor.

  • Environmental Considerations A. Company, its officers, agents, servants, employees, invitees, independent contractors, successors, and assigns will not discharge or spill any Hazardous Substance, as defined herein, into any component of the storm drainage system or onto any paved or unpaved area within the boundaries of the Premises. In addition, Company will not discharge or spill any Hazardous Substance into any component of the sanitary sewer system without first neutralizing or treating same as required by applicable anti-pollution laws or ordinances, in a manner satisfactory to Authority and other public bodies, federal, state, or local, having jurisdiction over or responsibility for the prevention of pollution of canals, streams, rivers, and other bodies of water. Company’s discharge, spill or introduction of any Hazardous Substance onto the Premises or into any component of Authority’s sanitary or storm drainage systems will, if not remedied by Company with all due dispatch, at the sole discretion of Authority, be deemed a default and cause for termination of this Agreement by Authority, subject to notice and cure. Such termination will not relieve Company of or from liability for such discharge or spill. B. If Company is deemed to be a generator of hazardous waste, as defined by federal, state, or local law, Company will obtain a generator identification number from the U. S. Environmental Protection Agency (EPA) and the appropriate generator permit and will comply with all federal, state, and local laws, and any rules and regulations promulgated thereunder, including but not limited to, ensuring that the transportation, storage, handling, and disposal of such hazardous wastes are conducted in full compliance with applicable law. C. Company agrees to provide Authority, within 10 days after Authority’s request, copies of all hazardous waste permit application documentation, permits, monitoring reports, transportation, responses, storage and disposal plans, material safety data sheets and waste disposal manifests prepared or issued in connection with Company’s use of the Premises. D. At the end of the Agreement, Company will dispose of all solid and hazardous wastes and containers in compliance with all applicable regulations. Copies of all waste manifests will be provided to Authority at least 30 days prior to the end of the Agreement.

  • Agreement Exceptions/Deviations Explanation If the proposing Vendor desires to deviate form the Vendor Agreement language, all such deviations must be listed on this attribute, with complete and detailed conditions and information included. TIPS will consider any deviations in its proposal award decisions, and TIPS reserves the right to accept or reject any proposal based upon any deviations indicated below. In the absence of any deviation entry on this attribute, the proposer assures TIPS of their full compliance with the Vendor Agreement.