Parameter Measured Clause Samples

Parameter Measured. Specific Conductivity‌
Parameter Measured. Velocity‌ Simple diagnostic procedures are provided to verify system operation. Beam Check requires an external computer. The Auto QC Test procedure requires only a few minutes and can be performed in the field from the keypad interface. These should be performed before each data run. Beam Check is a diagnostic program that is used to verify FlowTracker performance. This is the same diagnostic program used at SonTek; it provides you with a powerful tool for understanding and verifying system performance. We recommend you become familiar with this software and use it on a regular basis. To run Beam Check: 1. Hold the FlowTracker in a bucket of water (or a natural environment) such that the probe is submerged and there is a boundary (surface, side, or bottom) within view. a. Ideally, the boundary should be placed 20-30 cm (8-12 in) from the probe. b. You may need to add a small amount of fine dirt or other seeding material and stir the bucket well for good test conditions. Regular tap water usually does not have enough scatterers (seeding) for a valid test. 2. Connect the FlowTracker to the PC and turn the system on. a. Run the FlowTracker software (click Start | Programs | SonTek Software | FlowTracker).

Related to Parameter Measured

  • Non-Tariff Measures 1. A Party shall not adopt or maintain any non-tariff measures on the importation of any good of the other Party or on the exportation of any good destined for the territory of the other Party except in accordance with its WTO rights and obligations or in accordance with other provisions of this Agreement. 2. Each Party shall ensure its non-tariff measures permitted in paragraph 1 are not prepared, adopted or applied with a view to, or with the effect of, creating unnecessary obstacles to trade between the Parties.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Interim Measures 6.1 The Parties acknowledge that the British Columbia Claims Task Force made the following recommendation concerning Interim Measures:

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • General Measures Employees experiencing family violence have a right to request flexible working arrangements including changes to working times. Such requests will not be unreasonably refused.