Phase I Design Package. (Grading and Drainage). The Phase I Design Package to be provided by Engineer shall consist of the engineering and design of the Plant Site and shall include the following drawings: a) Cover Sheet b) Property Layout Drawing c) Grading, Drainage and Erosion Control Plan Drawing (Multiple Drawings if Required) i. Used for Land Disturbance Permitting ii. Site grading is held 6-inches low for topsoil and seeding d) Roadway Alignment Drawing
Appears in 2 contracts
Sources: Lump Sum Design Build Agreement (Green Plains Renewable Energy, Inc.), Lump Sum Design Build Agreement (Green Plains Renewable Energy, Inc.)
Phase I Design Package. (Grading and Drainage). The Phase I Design Package to be provided by Engineer shall consist of the engineering Engineering and design of the Plant Site site and shall include the following drawings:
a) Cover Sheet b) Property Layout Drawing c) Grading, Drainage and Erosion Control Plan Drawing (Multiple Drawings if Required) i. Used for Land Disturbance Permitting ii. Site grading is held 6-inches low for topsoil and seeding d) Roadway Alignment DrawingSheet
Appears in 2 contracts
Sources: Engineering Services Agreement (First United Ethanol LLC), Engineering Services Agreement (E Energy Adams LLC)
Phase I Design Package. (Grading and Drainage). The Phase I Design Package to be provided by Engineer shall consist of the engineering and design of the Plant Site and shall include the following drawings:
a) Cover Sheet Sheet
b) Property Layout Drawing Drawing
c) Grading, Drainage and Erosion Control Plan Drawing (Multiple Drawings if Required) i. Used for Land Disturbance Permitting ii. Site grading is held 6-inches low for topsoil and seeding d) Roadway Alignment Drawing)
Appears in 2 contracts
Sources: Lump Sum Design Build Agreement (ASAlliances Biofuels, LLC), Lump Sum Design Build Agreement (ASAlliances Biofuels, LLC)
Phase I Design Package. (Grading and Drainage). The Phase I Design Package to be provided by Engineer shall consist of the engineering and design of the Plant Site and shall include the following drawings:
a) Cover Sheet b) Property Layout Drawing c) Grading, Drainage and Erosion Control Plan Drawing (Multiple Drawings if Required) i. Used for Land Disturbance Permitting ii. Site grading is held 6-inches low for topsoil and seeding d) Roadway Alignment Drawing
Appears in 1 contract
Sources: Lump Sum Design Build Agreement (US BioEnergy CORP)
Phase I Design Package. (Grading and Drainage). The Phase I Design Package to be provided by Engineer shall consist of the engineering and design of the Plant Site and shall include the following drawings:
a) Cover Sheet b) Property Layout Drawing c) Grading, Drainage and Erosion Control Plan Drawing (Multiple Drawings if Required) i. Used for Land Disturbance Permitting ii. Site grading is held 6-inches low for topsoil and seeding d) Roadway Alignment DrawingSheet
Appears in 1 contract
Sources: Engineering Services Agreement (Cardinal Ethanol LLC)