Common use of Phase II Design Package Clause in Contracts

Phase II Design Package. The Phase II Design Package to be provided by ENGINEER shall provide the Engineering and design of site work and utilities for the Plant, all within the property line of Plant, and shall consist of the following 1) Cover Sheet 2) Property Layout Drawing 3) Site Grading and Drainage Drawing (Final Interior Plant Grading) 4) Roadway Alignment 5) Utility Layout (Fire Loop) • The OWNER is required to select an insurance provider to allow the proper positioning and number of required hydrants and hydrants with monitors. 6) Utility Layout (Potable Water) 7) Utility Layout (Well Water) if using on-site ▇▇▇▇▇ 8) Utility Layout (Sanitary Sewer) • ▇▇▇▇▇ Engineering does not design any on-site septic treatment or drain field, this will be designed by others and completed by the OWNER at the OWNER'S expense. 9) Utility Layout (Utility Water Blowdown) • The OWNER is required to supply the NPDES discharge point to allow line routing to be completed. • The OWNER is required to select the water supply and water treatment system to allow sizing of the line. 10) Utility Layout (Natural Gas) • ▇▇▇▇▇ Engineering provides a preferred routing through the site, line size and pipe specifications are typically provided by the gas supplier. 11) Geometric Layout (For Project Control Verification) 12) Site Utility Piping Tables Drawing 13) Tank Farm Layout Drawing 14) Tank Farm Details Drawing 15) Sections and Details Drawing (If required)

Appears in 3 contracts

Sources: Engineering Services Agreement (Advanced BioEnergy, LLC), Engineering Services Agreement (Advanced BioEnergy, LLC), Engineering Services Agreement (Advanced BioEnergy, LLC)