Physical Parameters Clause Samples

Physical Parameters. The project will be constructed on public property of the State of Georgia administered by the State Agency identified in the Contract as the Owner. A plat of boundary line survey of the property involved was furnished to the Design Professional under cover of a letter from the Owner identified in the Contract, and the Design Professional is entitled to rely on such information.
Physical Parameters. The Project will be constructed on public property of the Board of Public Education for the City of Savannah and the County of Chatham. A plat of boundary line survey of the property involved was furnished to the Design Professional under cover of a letter from the Owner, identified in the Contract, and the Design Professional is entitled to rely on such information.
Physical Parameters. The Project will be constructed on public property of the Unified Government of Athens- ▇▇▇▇▇▇ County.
Physical Parameters. “Example: Western Michigan University has defined the partial renovation of ▇▇▇▇▇▇▇ ▇▇▇▇ and the adjacent site next to ▇▇▇▇▇▇ Center as the new location for the School of Art.”
Physical Parameters. Size (Cross Sectional Area) Minimum No. of Strand in Conductor Nominal Insulation Thickness Minimum Inner Sheath Thickness Nominal Outer Sheath Thickness Approx. Overall Dia of Cable Approx. Weight of Cable With Al'm Cond. With Cu Cond. Sqmm No's No's mm mm mm mm Kg/Km Kg/Km 3X 25+16 6/6 6/6 1.20/1.00 0.30 2.00 23 700 1250 3X35+16 6/6 6/6 1.20/1.00 0.30 2.00 25 800 1550 3X 50+25 6/6 6/6 1.40/1.20 0.30 2.20 28 1050 2050 3X70+35 12/6 12/6 1.40/1.20 0.40 2.20 32 1400 2800 3X95 +50 15/6 15/6 1.60/1.40 0.40 2.20 36 1800 3700 3X120+70 15/12 18/12 1.60/1.40 0.50 2.40 39 2200 4700 3X150+70 15/12 18/12 1.80/1.40 0.50 2.40 43 2550 5550 3X 185+95 30/15 30/15 2.00/1.60 0.50 2.40 47 3150 6900 3X240+120 30/15 34/18 2.20/1.60 0.60 3.00 53 4050 8950 3X300+150 30/15 34/18 2.40/1.80 0.60 3.20 58 4900 11100 3X400+185 53/30 53/30 2.60/2.00 0.70 3.40 64 6150 14000 3X500+240 53/30 53/34 3.00/2.20 0.70 3.80 76 7900 18050 3X630+300 53/30 53/34 3.40/2.40 0.70 4.00 84 9900 22950 Property of TPSODL – Not to be reproduced without permission of TPSODL

Related to Physical Parameters

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-­‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.

  • Dimensions Education: Bachelor’s or Master’s Degree in Computer Science, Information Systems, or other related field. Or equivalent work experience. A minimum of 10 years of IT (including Web/Internet, database applications and data warehousing) and business/industry work experience, with at least 3 years of leadership experience in managing multiple, large, cross-functional teams or project, and influencing senior level management and key stakeholders.

  • Components Patheon will purchase and test all Components (with the exception of Client-Supplied Components) at Patheon’s expense and as required by the Specifications.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following: