Post-Commercial Operation Date Testing and Modifications. Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Generating Facility with the Transmission System in a safe and reliable manner. The Customer shall perform tests and provide models that accurately simulate the behavior of the Generating Facility per NERC Applicable Reliability Standards. Additionally, Customer shall perform generation testing as directed by ▇▇▇▇▇ ▇▇▇ if performance issues are noted in or as a result of such tests.
Appears in 2 contracts
Sources: Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia)
Post-Commercial Operation Date Testing and Modifications. Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Generating Facility with the Transmission System in a safe and reliable manner. The Customer shall perform tests and provide models that accurately simulate the behavior of the Generating Facility per NERC Applicable Reliability Standards. Additionally, Customer shall perform generation testing as directed by ▇▇▇▇▇ ▇▇▇ if performance issues are noted in or as a result of such tests.Interconnected Generating
Appears in 1 contract
Sources: Jea Agreement for Generator Interconnection to Transmission System (Jagits)