Potholing. Any potholing authorized by this License shall be subject to the direction of City’s Construction Inspector. Potholing using the soft dig method (vacuum soil extraction system) is preferred. If Licensee wishes to use any other mechanical method such as digging with a backhoe, License must submit a written request to the SFPUC at least five (5) business days prior to commencing such work and obtain the SFPUC’s prior written consent. Notwithstanding the foregoing, the last two feet (2’) above the top of the pipe must be dug manually, without the use of any machines.