Power Factor Requirement. Consistent with Section 4.7 of Appendix 2 to this ISA, the power factor requirement is as follows: 30 MW of the existing portion of the Customer Facility shall retain its existing ability to maintain a power factor of at least 0.95 leading to 0.90 lagging measured at the generator’s terminals. 20 MW of the existing portion of the Customer Facility shall retain its existing ability to maintain a power factor of at least 1.0 (unity) to 0.90 lagging measured at the Point of Interconnection. The increase of 3.8 MW to the Customer Facility associated with this ISA shall be designed with the ability to maintain a power factor of at least 1.0 (unity) to 0.90 lagging measured at the Point of Interconnection.
Appears in 1 contract
Sources: Interconnection Service Agreement
Power Factor Requirement. Consistent with Section 4.7 of Appendix 2 to this ISA, the power factor requirement is as follows: 30 The existing 383.3 MW of the existing portion of the Customer Facility shall retain its existing ability to maintain a power factor of at least 0.95 leading to 0.90 lagging measured at the generator’s terminals. 20 The existing prior increase of 8.7 MW of the existing portion of to the Customer Facility shall retain its existing ability to maintain a power factor of at least 1.0 (unity) to 0.90 lagging measured at the Point of Interconnection. The increase of 3.8 2 MW to the Customer Facility associated with this ISA shall be designed with the ability to maintain a power factor of at least 1.0 (unity) to 0.90 lagging measured at the Point of Interconnection.
Appears in 1 contract
Sources: Interconnection Service Agreement
Power Factor Requirement. Consistent with Section 4.7 of Appendix 2 to this ISA, the power factor requirement is as follows: 30 The existing 836 MW of the existing portion of the Customer Facility shall retain its existing ability to maintain a power factor of at least 0.95 leading to 0.90 lagging measured at the generator’s terminals. The increase of 20 MW of the existing portion of to the Customer Facility associated with the W3-162 ISA shall retain its existing be designed with the ability to maintain a power factor of at least 1.0 (unity) to 0.90 lagging measured at the Point of Interconnection. The increase of 3.8 6 MW to the Customer Facility associated with this ISA shall be designed with the ability to maintain a power factor of at least 1.0 (unity) to 0.90 lagging measured at the Point of Interconnection.
Appears in 1 contract
Sources: Interconnection Service Agreement