Common use of Power System Control Clause in Contracts

Power System Control. Install one (1) RTU at the Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution Provider’s grid control center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider shall own, operate and maintain the RTU as part of the Distribution Provider’s Interconnection Facilities.

Appears in 3 contracts

Sources: Clustering Large Generator Interconnection Agreement and Distribution Service Agreement, Generator Interconnection Agreement, Clustering Large Generator Interconnection Agreement (Giaclgia)

Power System Control. Install one (1) RTU at the Large Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Large Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution ProviderParticipating TO’s grid control center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider Participating TO shall own, operate and maintain the RTU as part of the Distribution ProviderParticipating TO’s Interconnection Facilities.

Appears in 3 contracts

Sources: Large Generator Interconnection Agreement (Lgia), Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement (Lgia)

Power System Control. Install one (1) RTU at the Small Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Small Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution ProviderParticipating TO’s grid control centerGrid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider Participating TO shall own, operate and maintain the RTU as part of the Distribution ProviderParticipating TO’s Interconnection Facilities.

Appears in 3 contracts

Sources: Small Generator Interconnection Agreement (Sgia), Small Generator Interconnection Agreement, Small Generator Interconnection Agreement

Power System Control. Install one (1) RTU at the Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Generating Facility and the plant auxiliary load, and transmit the information received thereby to the Distribution ProviderParticipating TO’s grid control centerGrid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider Participating TO shall own, operate and maintain the RTU as part of the Distribution ProviderParticipating TO’s Interconnection Facilities.

Appears in 1 contract

Sources: Large Generator Interconnection Agreement (Lgia)

Power System Control. Install one (1) RTU at the Small Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Small Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution Participating TO’sDistribution Provider’s grid control centerGrid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Participating TODistribution Provider shall own, operate and maintain the RTU as part of the Distribution Participating TO’sDistribution Provider’s Interconnection Facilities.

Appears in 1 contract

Sources: Small Generator Interconnection Agreement (Sgia)

Power System Control. Install one (1) RTU at the Large Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Large Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution ProviderParticipating TO’s grid control centerGrid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider Participating TO shall own, operate and maintain the RTU as part of the Distribution ProviderParticipating TO’s Interconnection Facilities.

Appears in 1 contract

Sources: Large Generator Interconnection Agreement

Power System Control. Install one (1) RTU at the Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Generating Facility RE Columbia Project and plant auxiliary load, and transmit the information received thereby to the Distribution Provider’s grid control centerGrid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider shall own, operate and maintain the RTU as part of the Distribution Provider’s Interconnection Facilities.

Appears in 1 contract

Sources: Clustering Large Generator Interconnection Agreement (Clgia)

Power System Control. Install one (1) RTU at the Small Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Small Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution Provider’s grid control centerGrid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider shall own, operate and maintain the RTU as part of the Distribution Provider’s Interconnection Facilities.

Appears in 1 contract

Sources: Small Generator Interconnection Agreement (Sgia)

Power System Control. Install one (1) RTU at the Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution Provider’s grid control centerGrid Control Center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider shall own, operate and maintain the RTU as part of the Distribution Provider’s Interconnection Facilities.

Appears in 1 contract

Sources: Generator Interconnection Agreement

Power System Control. Install one (1) RTU at the Small Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Small Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution Provider’s grid control center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider shall own, operate and maintain the RTU as part of the Distribution Provider’s Interconnection Facilities.

Appears in 1 contract

Sources: Small Generator Interconnection Agreement (Sgia)

Power System Control. Install one (1) RTU at the Generating Facility to monitor typical generation elements such as MW, transmit generator unit ▇▇▇▇▇ ▇▇ and MVAR, terminal voltage and circuit breaker status for the Generating Facility and plant auxiliary load, generator status, generator circuit breaker status, generator terminal voltage, and transmit the information received thereby to the Distribution Provider’s grid control centerproject net MW and MVAR. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider Participating TO shall own, operate and maintain the RTU as part of the Distribution ProviderParticipating TO’s Interconnection Facilities.

Appears in 1 contract

Sources: Large Generator Interconnection Agreement

Power System Control. Install one (1) RTU at the Generating Facility to monitor typical generation elements such as MW, MVAR, terminal voltage and circuit breaker status for the Generating Facility and plant auxiliary load, and transmit the information received thereby to the Distribution ProviderParticipating TO’s grid control center. Notwithstanding that the RTU will be located on the Interconnection Customer’s side of the Point of Change of Ownership, the Distribution Provider shall Participating TO will own, operate and maintain the RTU as part of the Distribution ProviderParticipating TO’s Interconnection Facilities.

Appears in 1 contract

Sources: Large Generator Interconnection Agreement (Lgia)