Preliminary Documents Clause Samples

Preliminary Documents. These services include development of preliminary documents, including, but not limited to; feasibility reports, alternatives analyses, plans and/or reports to document findings and recommendations. The Provider shall develop selection criteria that shall be used to determine alternatives for a wide range of projects. This selection criteria will be used to assess and develop alternatives that are feasible and fit within the project constraints while meeting stakeholder needs.
Preliminary Documents. Preliminary documents must illustrate and describe the refinement of the design of the Project, establishing the scope, relationships, forms, size and appearance of the Project by means of plans, sections, and elevations, typical construction details, and equipment layouts. At the Department’s direction, the preliminary documents must include but not be limited to existing conditions plans, site demolition plans, civil site plans, landscape plans, utility site plans, erosion and sedimentation control plans, structure demolition plans, floor plans, exterior elevations, building sections, typical wall sections, structural plans and details, finish scheduled, door and window schedules, mechanical, plumbing electrical, and other building system plans and details, cut sheets of finish materials, fixtures, and major building systems equipment, full draft specification, documentation of contact with utilities, updated listing of required permits and approvals with copies of applications, application drafts, and regulatory replies received to date, sustainable opportunities status, updated Project Schedule, and Statement of Probable Construction Cost.
Preliminary Documents. The term “Preliminary Documents” is defined in Article 3.2.1 of this Agreement.
Preliminary Documents. Not used.‌
Preliminary Documents 

Related to Preliminary Documents

  • Preliminary Matters 3.1. At least five (5) days prior to the pre-construction meeting described in Section 3.2, Contractor shall submit to Consultant for Consultant’s review and acceptance: 3.1.1. A progress schedule in the indicated form: Bar Chart Modified Critical Path Method (“CPM”) CPM Computerized CPM (CPM is interpreted to be generally as outlined in the Association of General Contractors (“AGC”) publication, “The Use of CPM in Construction.”) The progress schedule shall indicate the start and completion dates of the various stages of the Work, and shall show an activity network for the planning and execution of the Work. Included with the progress schedule shall be a narrative description of the progress schedule. The progress schedule must be updated monthly by Contractor, submitted as part of each Application for Payment, and must be acceptable to Consultant. 3.1.2. A preliminary schedule of Shop Drawing submissions; and 3.1.3. In a lump sum contract or in a contract that includes lump sum bid items of Work, a preliminary schedule of values for all of the Work that includes quantities and prices of items aggregating the Contract Price and that subdivides the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include a breakdown of labor, equipment, materials, and an appropriate amount of overhead and profit applicable to each item of Work, which amounts Contractor must confirm in writing at the time of submission. In addition, after award but prior to the submission of the progress schedule, Consultant, Contract Administrator, and Contractor shall meet with all utility owners and secure from them a schedule of utility relocation; provided, however, that neither Consultant nor Town shall be responsible for the nonperformance by the utility owners. 3.2. At a time specified by Consultant, but before Contractor starts the Work at the Project site, a conference attended by Contractor, Consultant, and others as deemed appropriate by Contract Administrator, will be held to discuss the schedules referred to in Section 3.1; to discuss procedures for handling Shop Drawings and other submittals and for processing Applications for Payment; and to establish a working understanding among the Parties as to the Work. 3.3. Within thirty-five (35) days from the Project Initiation Date set forth in the applicable Notice to Proceed, a conference attended by Contractor, Consultant, and others, as appropriate, will be held to finalize the schedules submitted in accordance with Section 3.1. Within forty-five

  • Ancillary Documents (a) Project Co shall not: (i) terminate or agree to the termination of all or part of any Ancillary Document, except pursuant to Sections 27.3, 49.3 and 50.2 or otherwise to prevent or cure a Project Co Event of Default (provided that commercially reasonable alternative measures would not prevent or cure such Project Co Event of Default); (ii) make or agree to any amendment, restatement or other modification or exercise any of its rights under any Ancillary Document that materially adversely affects Project Co’s ability to perform its obligations under this Project Agreement or that has the effect of increasing any liability of Contracting Authority, whether actual or potential; (iii) breach its obligations (or waive or allow to lapse any rights it may have) or permit others to breach their obligations (or waive or allow to lapse any rights they may have) under any Ancillary Document, if any such breach (or waiver or lapse) would materially adversely affect Project Co’s ability to perform its obligations under this Project Agreement or that have the effect of increasing any liability of Contracting Authority, whether actual or potential; or (iv) enter into, or permit the entry into by any other person of, any agreement replacing all or part of any Ancillary Document, except in the circumstances referenced in Section 8.2(a)(i), without the prior written consent of Contracting Authority, provided that, where consent is requested pursuant to Section 8.2(a)(i) or 8.2(a)(iv), such consent shall not be withheld, and shall be provided within a reasonable time, where the relevant matter referred to in Section 8.2(a)(i) or 8.2(a)(iv) will not materially adversely affect Project Co’s ability to perform its obligations under this Project Agreement or have the effect of increasing any liability of Contracting Authority, whether actual or potential. In the event of termination or agreement to the termination of all or part of any Ancillary Document as described in Section 8.2(a)(i), or the entering into of any agreement replacing all or part of any Ancillary Document as described in Section 8.2(a)(iv), Project Co shall, to the extent applicable, comply with all provisions herein relating to changes in Subcontractors, including Section 49.3. (b) Upon the written request of Contracting Authority or the Contracting Authority Representative, Project Co will deliver or cause to be delivered to Contracting Authority or the Contracting Authority Representative a copy of any notices delivered or received by Project Co under any of the Ancillary Documents.

  • Acquisition Documents (a) Borrowers and Guarantors have delivered, or caused to be delivered, to Agent, true, correct and complete copies of the Acquisition Documents. (b) The Acquisition Documents set forth the entire agreement and understanding of the parties thereto relating to the subject matter thereof, and there are no other agreements, arrangements or understandings, written or oral, relating to the matters covered thereby. (c) None of the Acquisition Documents have been amended or otherwise modified without the prior written consent of Agent. (d) The execution, delivery and performance of the Acquisition Documents have been duly authorized by all necessary action on the part of Parent and each of its Subsidiaries that is a party thereto and to the best of the knowledge of Borrowers and Guarantors, each other party thereto. Each of the Acquisition Documents is the legal, valid and binding obligation of the parties thereto, enforceable against such party in accordance with its terms, except as enforceability may be limited by applicable bankruptcy, insolvency, reorganization, moratorium, liquidation or other similar laws affecting creditors' rights generally. All actions taken by Parent and its Subsidiaries pursuant or in connection with the purchase of the TUG Acquisition Assets and the Capital Stock of TUG NY, Clare, FMI Blocker, FMI Holdco and Sea Master Hong Kong have been taken in compliance with the terms of the Acquisition Documents. (e) No party to any of the Acquisition Documents is in default with respect to any of its obligations under such Acquisition Documents in any material respect and all representations and warranties made by the parties thereto in the Acquisition Documents and in the certificates delivered in connection therewith are true and correct as of the date hereof, except as waived in writing with the approval of Agent. The reports, financial statements, certificates and other written information with respect to the purchase of the TUG Acquisition Assets and the Capital Stock of TUG NY, Clare, FMI Blocker, FMI Holdco and Sea Master Hong Kong in connection with the Acquisition Documents, furnished to Agent by Borrowers, taken as a whole (as modified or supplemented by other written information so furnished), do not contain any material misstatement of fact or omit to state any material fact necessary to make the statements therein, in the light of the circumstances under which it was made, not misleading.

  • Related Documents The words "Related Documents" mean all promissory notes, credit agreements, loan agreements, environmental agreements, guaranties, security agreements, mortgages, deeds of trust, security deeds, collateral mortgages, and all other instruments, agreements and documents, whether now or hereafter existing, executed in connection with the Loan.

  • Construction Documents Phase Bidding or Negotiation Phase: