Development of Preliminary Sample Clauses

Development of Preliminary. Design Drawings shall include the following: • Traffic Control Plan updated to reflect any changes as a result of the conceptual design submittal while also including all construction signage and pavement markings which will be in accordance with the latest edition of the Texas Manual on Uniform Traffic Control Devices. • A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8” Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Existing and proposed typical section sheets. • Roadway plan and profile sheets displaying station and coordinate data for all horizontal alignment P.C.’s, P.T.’s, P.I.’s; station and elevation data of all vertical profile P.C.’s, P.T.’s, P.I.’s, low points, and high points; lengths of vertical curves, grades, K values, e, and vertical clearances where required. • Roadway Cross sections • No less than two bench marks plan/profile sheet. • Bearings given on all proposed centerlines, or baselines. • Station equations relating utilities to paving, when appropriate. • Preliminary roadway details. • A drainage area map will be drawn at maximum 1" = 200' scale from available 2- foot contour data with the contours labeled. Data source and year will be provided by the CITY. • Culvert and Stormdrain Plan & Profile Sheets, including inlet and hydraulic calculations • Preliminary signing and pavement marking layouts. • Grading Plans • Pedestrian & bicycle path plans • Retaining wall plans A. 30% Plans B. 30% Specifications C. 30% Estimate Engineer will perform level A/B SUE within the existing and proposed Right-of-Way for ▇▇▇▇▇ Road, the adjacent cross streets within 200 feet of ▇▇▇▇▇ Road, and along the proposed realignment and widening of ▇▇▇▇▇▇▇ Street. Additionally, Engineer will perform sixteen (24) level A test holes once level B data has been reviewed.
Development of Preliminary. Design Drawings shall include the following: • Cover SheetGeneral NotesHorizontal Control • Overall Project LayoutTypical Sections Existing and Proposed • Demolition Sheet • Drainage Area MapDrainage CalculationsStorm Drain Plan and Profiles (as needed) • Pavement Plan and Profiles • Roadway Cross Sections • Intersection Layouts • Signal Layouts (as needed) • Street Lighting PlanTraffic Control Plan • ▇▇▇ Plan Layout • General Details (as needed)
Development of Preliminary. Design Drawings and Specifications shall include the following: • Cover SheetProject Control Sheet with benchmarks and control points. • General Notes Sheet • Overall project property sheet(s) with property owner information. • Overall project water layout sheets. The water layout sheet shall identify the proposed water line improvements, existing water and sewer lines in the vicinity. • Water Plan and Profile sheets including, but may not be limited to, the following: ⮚ Proposed water line alignment ⮚ Pipe size(s) ⮚ Valves ⮚ Appurtenances ⮚ Service connections ⮚ Pavement repair limits ⮚ Easement and ROW limits ⮚ Property ownership informationExisting utilities ⮚ Temporary water lines ⮚ Coordinates on all P.C.’s, P.T.’s, P.I.’s, valves, mainline fittings, etc., in the same coordinate system as the Control Points • In general, proposed water lines less than 12” diameter will not be profiled. However, where deemed appropriate, profiles will be provided to help clarify the vertical alignment and relationship to existing utilities and features. • Water lines 12” and larger will be profiled. • The CONSULTANT shall make provisions for reconnecting all identifiable water service lines which will be impacted by the proposed main, including replacement of existing service lines within City right-of-way or utility easement. • The CONSULTANT will prepare special details for the water line installation and/or replacement that are not already included CITY’s standard details. These may include connection details between various parts of the project, tunneling details, boring and jacking details, relocations, details unique to the construction of the project, trenchless details, and special reconnections.
Development of Preliminary. Design Drawings shall include the following:  Cover Sheet
Development of Preliminary. Design Drawings and Specifications shall include the following:  Preliminary cover and index of sheets including project limits, area location map and beginning and end station limits  A Project Control Sheet, showing all Control Points, used or set while gathering data. Generally on a scale of not less than 1:200. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8” Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street).  SUE plan drawings.  Updated existing and proposed typical section sheets.  Updated roadway plan and profile sheets displaying station and coordinate data for all horizontal alignment P.C.’s, P.T.’s, P.I.’s; station and elevation data of all vertical profile P.C.’s, P.T.’s, P.I.’s, low points, and high points; lengths of vertical curves, grades, K values, e, and vertical clearances where required.  Updated roadway cross section sheets displaying existing and proposed grades, pavement section, sidewalks and top of curb elevations.  No less than two benchmarks plan/profile sheet.  Bearings given on all proposed centerlines, or baselines.  Station equations relating utilities to paving, when appropriate.  Overall project easement layout sheet(s).  Intersection layout sheets including ROW lines, horizontal alignments, utilities, curbs, sidewalks, driveways, lane dimensions and arrows, and existing and proposed contours (0.25’ intervals). Also included in this task preliminary signal improvements will be identified for all intersections, including future signal accommodations at the RaceTrac/Sonic Drive-In intersection, that are planned to be signalized within the scope of the project.  Preliminary roadway details to include curbs, curb expansion joints, driveways, sidewalks, and pavement details.  Preliminary Traffic design including signing, pavement marking, and signal improvement plans.  Traffic Control Plan updated to reflect any changes as a result of the conceptual design submittal while also including all construction signage and pavement markings which will be in accordance with the latest edition of the Texas Manual on Uniform Traffic Control Devices.  Preliminary erosion contr...

Related to Development of Preliminary

  • STATEMENT OF PHILOSOPHY The University of Minnesota and the Union are committed to recognizing and acknowledging the healthy and positive diversity that we have on the University campuses. Further, the parties recognize that all employees have the right to work in a productive environment in which there is no verbal or physical intimidation, or discrimination or harassment based on the criteria provided in Section 1, Discrimination Prohibition, and Section 2, Sexual Harassment. It is in this spirit that the parties agree to the provisions of this Article. This statement shall not be grievable nor shall either party use this Section as evidence or argument in arbitration.

  • DEVELOPMENT OR ASSISTANCE IN DEVELOPMENT OF SPECIFICATIONS REQUIREMENTS/ STATEMENTS OF WORK

  • STATEMENT OF PURPOSE The purpose of this Interlocal Cooperation Contract [Contract] is to allow DIR Customer to purchase information resources technologies through DIR Contracts.

  • Completion of Negotiations This Agreement represents complete collective bargaining and full agreement by the District and the Federation with respect to wages, hours of employment, and all other terms and conditions of employment which shall prevail during the term or terms hereof. This Agreement expresses the entire understanding between the parties and supersedes all previous agreements between them, written or oral. Any matter or subject not herein covered has been satisfactorily adjusted, compromised, or waived by the parties for the life of this Agreement.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in ▇▇▇▇▇, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.